Download presentation
Presentation is loading. Please wait.
Published byWinifred Allen Modified over 9 years ago
1
Closing Remarks Page 1 Closing Remarks Robert Schweiss
2
Closing Remarks Page 2 Agenda Road Less Traveled Meetings … Where to from here? Where to from here … Schedule Issues as captured during meeting… Conclusion
3
Closing Remarks Page 3 Sept 5, ‘07 CERES Study WG Meeting. SDS impacts submitted, Sept 15. Jan 15th, 2008 DPMC, approved adding CERES FM5 to NPP Mission Jan 16th, 2008 EXCOM concurred Feb 28th, 2008 SDS NPP CERES Presentation at LaRC –SDS kick off June 11th, IDPS F2F, Denver Colorado July CERES TIM @ GSFC –AI ‘s assigned Aug 26th Land PEATE, SD3E, and CERES CARS dCDR @ GSFC Road Less Traveled
4
Closing Remarks Page 4 IDPS Quarterly Face-to-Face meetings IDPS Major Milestones –BAR, CDW, H/W Decision, etc. DFWG (Data Format Working Group) EIWG (External Interfaces Working Group) NSIPS to SDS I/F Meeting NIWG (NPP Integration Working Group) NGST’s ERB (Engineering Review Board) NGST ARB (Algorithms Review Board) IPO’s CCB (Configuration Control Board) UC/NCF Customer Forum Quarterly Meetings NPP I&T Working Group Meeting Meetings, Meetings, Meetings
5
Closing Remarks Page 5 Documentation Landscape From Various Sources (VOAT, O3OAT etc) –ATBD Documents From IPO/NGST et al –EDR-IR, EDR-PR, OAD, From IPO/NGST –NPOESS to SDS ICD –NPOESS to NOAA ICD –NPOESS CDFCB Volume 1 Overview –NPOESS CDFCB Volume 2 RDR Format –NPOESS CDFCB Volume 3 SDR & TDR Format –NPOESS CDFCB Volume 4 (Parts 1- 4) EDR Format –NPOESS CDFCB Volume 5 Metadata –NPOESS CDFCB Volume 6 Ancillary Data Messages, & Reports –NPOESS CDFCB Volume 7 Data formats for the NPOESS application packets –NPOESS Common Interfaces and Services ICD –NPOESS Internal DFCB Volume III – Retained Intermediate Product Formats From NOAA –NOAA CLASS to User Community IRD From NPP Project Office –Mission Data Format Control Book –NPP System Integration and Test Plan –NPP Mission Operations Management Plan –NPP Mission Requirements Specification
6
Closing Remarks Page 6 Where to from here? Coordinate, Support, Leverage Testing –Functional Threads Tests – Mission Event Planning & Scheduling (FTT1A/B) – Command Processing (FTT2A/B) – Flight Vehicle Software Change / Load (FTT3) – Telemetry Processing (FTT4A/B) – Mission Administrative Info Handling (FTT5) – Ingest SMD, RDR Generation and Routing (FTT6A/B) – SDR & EDR Generation and Routing (FTT7) – SDS Data Ingest (FTT8) – SDS Radiometric Assessment (FTT9) – SDS Geometric Characterization (FTT10) – SDS Calibration Activities (FTT12) – User Query, Order and Product Distribution (FTT 14) – Encryption Key Checkout (FTT 15A/B, 16) – HRD – APID Selection (FTT 19) – Orbit Maintenance (FTT 21) – Safe-Hold Autonomous Fail-Safe Occur. & Recovery (FTT 22) – Anomaly Detection & Reaction (FTT 23) – NPP Ground System Activation (FTT 24)
7
Closing Remarks Page 7 Where to from here? Generate a CCR to update requirements Integrate a schedule Prioritize Issues and develop work off plans. Peer MOR (Aug 27-28, 2008) MOR (November 2008) – Mission readiness assessment review NCT 3 (June ‘09) –Execute nominal mission data handling propagating data through the ground system with all 4 flight sensors on board the satellite and after installation of the ground system on-site (72 Hrs.) NCT 4 (TBD) –Exercises mission configuration, 3 days in the mission life with all elements of ground segment. Real-time telemetry and SMD may be played back from local storage at the Svalbard station to C3S and IDPS using the operational links.
8
Closing Remarks Page 8 Schedule April 21, 2005 NPP SDS SRR March 2005NPP SD3E Prototype started August 2005NPP PRE MOR September 2005 NPP SD3E Hardware Buy Build 1 November 2005NPP SD3E Hardware Build 1 Installation November 2Peer Review (SD3E & Ozone PEATE) November 9Peer Review (NICSE) November 30 Peer Review (Ocean & Land PEATE) Spring 2006NPP SDS Build 1 September 19, 2006NPP SDS PDR April 10, 2007Atmosphere PEATE PDR June 19, 2007Sounder PEATE PDR July 18, 2007Peer Review SD3E, Ocean,Land,Ozone,I&TSE Sept 14, 2007NICSE Peer Review October 31 - Nov 1NPP SDS CDR December 2007SDS Release 2 August 2008dCDR CERES Data September 2008Sounder & Atmosphere PEATE CDR (TBD) Launch -12 Operations Personnel on board March 2008 Mission Operations Review April 2009Operations Readiness Review July 2009Mission Readiness Review September 30, 2009Launch Readiness Date (LRD)
9
Closing Remarks Page 9 Issues As Captured Need 28hrs of RDR data fall ‘08 Oct -Nov –W/o this data systems may not be ready for NCT3 Not clear who was writing/describing some “unique” data products e.g., VIIRS resample SDRs –A table of products, formats, and documentation source is needed. Xtalk issue may need to be revisited as related to to choosing I1 over M5 Coordinate build schedule plans w/ NPP Project SI&T as related GS Freeze –It was not clear whether or not the build 3 schedule was acceptable with NPP SI&T.
10
Closing Remarks Page 10 SDS Schedule (1 or 3)
11
Closing Remarks Page 11 SDS Schedule (2 or 3)
12
Closing Remarks Page 12 SDS Schedule (3 or 3)
13
Closing Remarks Page 13 Closing Remarks NPP SDS is a research tool for NPP EDR Evaluation –Supports the NPP Science Team NPP SDS PEATE is implemented through leveraging off existing resources –For Example: Ocean Color Data Processing, MODAPS, & OMI/TOMS NPP SDS Elements Land Ocean and SD3E and now CERES CARS can support handling CERES data for the NPP Mission. Reminder: Panel Members are requested to disposition RFAs immediately after the meeting
14
Closing Remarks Page 14 Acronyms
15
Closing Remarks Page 15 Acronyms AoOperational Availability ADSArchive and Distribution Segment ADPAncillary Data Providers AFWAAir Force Weather Agency Anal.Analysis ANSIAmerican National Standards Institute ATBDAlgorithm Theoretical Basis Document ATMSAdvanced Technology Microwave Sounder BBBlack Body BRDFBidirectional Reflectance Distribution Function BTDFBidirectional Transmissive Distribution Function C3SCommand, Control and Communications Segment CARSClimate Analysis and Research Service CCBConfiguration Control Board CCSClimate Calibration Service CDMSClimate Data Management Service CDPsClimate Data Products CDRsClimate Data Records CLASSComprehensive Large Array-data Stewardship System CMConfiguration Management CMSClimate Mission Storage COTSCommercial Off-the-Shelf CrISCross-Track Infrared Sounder DCAVSDistributed CDR/EDR Algorithm Validation Service DDRData Delivery Report DEMDigital Elevation Model Demo.Demonstration DFDData Flow Diagram DNDelivery Notification DoDDepartment of Defense DQMData Quality Management EDRsEnvironmental Data Records EDUEngineering Development Units EOSEarth Observing System EOSDISEarth Observing System Data and Information System ESEEarth Sciences Enterprise GSFCGoddard Space Flight Center I&TSEIntegration and Test System Element ICDInterface Control Document IDPSInterface Data Processing Segment Insp.Inspection IPIntermediate Products IPOIntegrated Program Office IRDInterface Requirements Document ISFIntegrated Support Facility ITInformation Technology JPLJet Propulsion Laboratory LEO&ALaunch, Early Orbit, and Activation LRDLaunch Readiness Date
16
Closing Remarks Page 16 Acronyms LSSLaunch Support Segment LTALong Term Archive LUTLook-up Tables MDTMean Down Time MODISModerate Resolution Imaging Spectrometer MODAPSMODIS Data Processing System MRSMission Operations Concept MTBDEMean Time Between Downing Events N/ANot Applicable NASANational Aeronautics and Space Administration NESDISNational Environmental Satellite, Data, and Information Service NEXTNPP EDU eXchange Toolkit NGSTNorthrop Grumman Space & Mission Systems Corp. Space Technology NICSENPP Instrument Calibration and Support Element No.Number NOAANational Oceanic and Atmospheric Administration NPOESSNational Polar-orbiting Operational Environmental Satellite System NPPNPOESS Preparatory Project NWPNumerical Weather Prediction OMPSOzone Mapper/Profiler Suite OSHAOccupational Safety and Health Administration PDRProduct Subscription Request PEATEProduct Evaluation and Analysis Tool Element POSPerformance and Operations Specification POSIXPortable Operating System Interface for Computer Environments PSOEProject Science Office Element PSTProject Science Team RDRsRaw Data Records RSBReflective Solar Band RSRRelative Spectral Response RVSResponse Versus Scan Angle SDSolar Diffuser SD3EScience Data Distribution and Depository SDRsSensor Data Records SDSScience Data Segment SDSMSolar Diffuser Stability Monitor SERScientific, Engineering and Research SI&TSystem Integration and Test SRDSensor Requirements Document STScience Team TBDTo Be Determined TBRTo Be Resolved TBSTo Be Supplied TDRTemperature Data Record TEBThermal Emissive Band TEUsTelemetry in Engineering Units TVThermal Vac UTCUniversal Time Coordinate VIIRSVisible Infrared Imager Radiometer Suite VDDVersion Description Document xDRsRDR, EDR, SDR, and TDR
17
Closing Remarks Page 17 SDS Level 1 Requirements (Outdated)
18
Closing Remarks Page 18 SDS Level 1 Requirements
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.