Download presentation
Presentation is loading. Please wait.
Published byVernon Parrish Modified over 9 years ago
1
Jarred Alexander Young October 22, 2012
2
All components biased relative to ground May prevent beam generation Beam Diagnostics thrown off by Decel Grid Bias Solution: Convert to generic Ion Engine electrical configuration
3
QuantityBias (V)Power Supply Bias above/below ground (V) Anode/Beam Voltage (AN) 250A0150NX05 (x2)+250 Discharge (DC)70A0100MX25+180 Emitter Filament (EF) 10A20H950+170 Accel Grid (AC)290N01HA30-290 Neutralizer Filament (NF) 10 (?)HY3010E-3+10 Electrical Set-up for 5000 s ISP beam
4
Beam analysis using FC-71A RPA/Faraday Cup Mounted in center of engine beam Determines Beam Current ▪ Ion Density ▪ Ion Flux Beam Energy Goal To develop a matrix of possible test settings and corresponding fluence times + +
5
Test Variables Main Emitter Filament Current (4.5, 5, 5.5 A) Discharge Voltage (30-70 V) Accelerator Grid Voltage (100-290 V) ▪ 290 V corresponds to 5000 s ISP Beam I-V Curves Take I-V Curves from every point in text matrix ▪ Calculate Ion Density and Flux Take derivative w.r.t. Voltage to find Beam Energy Distribution Compile energy distribution data
6
Conduct beam testing and analysis Design mount for material coupons Procure Equipment Filament power supply should arrive by mid-week Diagnostic Equipment ▪ Keithley 2410 Sourcemeter in by end of week ▪ Keithley 6485 Picoammeter status unknown
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.