Sustainable Roof Systems THE PLANETEERS In collaboration with LionForce Systems Dr. Diana Glawe Professor Kimberly Drennan
2
LionForce Systems Panelized Pre-Fabricated Houses Goals: –1. Create structural support and environmental seal –2. Increase 14-ft roof span 20 ft –3. Increase 2-ft overhang 4 ft
3
Roof-to-wall Joint & Span Notice the air gap!
4
Overhang
5
Design Overview
6
Pro Engineer Drawings
7
Simulation with Pro Mechanica
8
Wedge Critical Load
9
Load Calculations
10
Code: L ~ 30 psf For: 6 in. thickness, 20 ft. span, 2 ft. overhang, 8:12 pitch –Max stress: 177 psi –Yield stress: 25 to 200 ksi
11
Overhang Recommendations Overhang with Truss Support
12
Internal FBD for member AC External FBD of Overhang Support Bracket Overhang FBDs
13
Thermal Considerations Total R-Value of Panel Trancon Delta Stud2.24 Typical C-Stud1.63 http://www.transconsteel.com/products/ultraframe/stud.asp
14
Thermal Considerations ComponentR-ValueDepthR-Value * Depth Outside Air Film0.17N/A0.17 Steel Roof02"0 Fiberboard2.781.5"4.17 Roof Panel2.244"8.96 1/2" Insulation Sheathing3.21/2"3.2 1/2" Drywall0.45N/A0.45 Inside Air Film0.92N/A0.92 TOTAL17.87
15
Fit Tests Mechanical Fit tests – ABT wall panel, Transcon Roof panel
16
Evaluation of Objectives LionForce goals v. our success Structural support & environmental seal in wall joint –Success! Increase span –Success! Increase overhang –Partial success
17
Thank you! Dr. Glawe Dr. Nickels Professor Drennan Manuel Lionforce Systems Geoffrey Jennings & Transcon Steel Robert Ross & Accelerated Building Technologies