Download presentation
Presentation is loading. Please wait.
Published byEugenia Cain Modified over 9 years ago
1
Technology Readiness in Michigan MAEDS 2014 Fall Conference MTRAx
2
Agenda Fall 2014 data collection update Submitting / confirming your data New requirements Future enhancements Instructional measures Tech planning Low effort data collection New interface
3
Fall 2014 Data Collection New development and hosting for MTRAx Updated look and feel Working towards new interface (Winter 2015)
4
Fall 2014 Data Collection Data collection window is currently open Oct 1 thru Nov 14 You must update or confirm your data prior to Nov 14 in order to eligible to participate in TRIG Training webinar available on Resources page on mtrax.org
5
Fall 2014 Data Collection Submitting or confirming your data After any updates at the building or district level, save your data in the Data Editor After your submission (or after you have confirmed your data), click the Finalize Submission button on the District Data Editor
6
New Requirements New Network Readiness Scoring TSM caching server available from DRC - OPTIONAL Stores assessment content locally in district to reduce bandwidth requirement and increase performance Network metrics: With TSM – 20 kbps / student Without TSM – 80 kbps / student
7
New Requirements New Network Readiness Scoring MTRAx will be reporting network readiness scores for both metrics Dual network readiness scoring to be reported at all levels: Building District ISD State
8
New Requirements MDE Testing Specifications
9
New Requirements MDE Testing Specifications Test Sittings per Student = 4 Test Sessions per Day = 2 Testing Window Grades 3-8 = 15 Days Grade 11 = 40 Days Testing windows to be deployed in coming weeks These items will not be user configurable in MTRAx
10
New Requirements DRC Supported Operating Systems All minimum hardware and software requirements are available on the Resources page on mtrax.org Supported: Mac OSX 10.6.8 or greater iOS 7.1 or greater More granular than was previously identified in MTRAx Mac OSX 10.6 iOS 7
11
New Requirements DRC Supported Operating Systems If you have devices in MTRAx with either of these operating systems, update device data prior to Nov 14 deadline Any devices that have not been edited by Nov 14 will be subject to systematic clean-up The assumption will be that they are NOT compliant
12
Future Enhancements Instructional Measures Technology Planning Low Effort Data Collection New Interface
13
Instructional Measures Identify the readiness of teachers and students for online testing Workgroup formed to define requirements with participation from: ISD staff LEA staff MDE Draft requirements completed, seeking feedback from the field to finalize at TRIG Mini-conferences
14
Instructional Measures Defined metrics for student and staff readiness Students: Technical competencies by grade band K-2, 3-5, 6-8 and 9-12 Teachers: Technical competencies Instructional practices
15
Instructional Measures Data Collection & Reporting Exploring the use of the ASSIST platform for data collection Teachers to complete student survey based on their observation of competencies Teachers to self-complete teacher survey Reporting only at the building level, with drill down by competency
16
Technology Planning Define new technology planning process Workgroup formed to define requirements with participation from: ISD staff LEA staff MDE Draft requirements completed, seeking feedback from the field to finalize at TRIG Mini-conferences
17
Technology Planning Align process to School Improvement Transition from an activity to build a tech plan document to a meaningful, on-going technology planning process Process to support all technology related goals within a district
18
Technology Planning Utilize ASSIST platform for technology diagnostics Needs assessment Project scoping Utilize existing district governance for identification of projects
19
Technology Planning Allow for regional and peer review Cross functional teams for planning and review activities Approval no longer required
20
Low Effort Data Collection Automate the collection of MTRAx network data Riverbed Networks solution Pilot districts identified, deployment in progress Statewide deployment by March 2015
21
New MTRAx User Interface
24
Thank You Questions? Matthew.Lindner@plantemoran.com Matthew.Lindner@plantemoran.com www.mtrax.org www.mtrax.org www.22itrig.org www.22itrig.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.