How does the Dutch Health Facilities Act work? Marinus Verweij MD Director Netherlands Board for Hospital Facilities.

Similar presentations


Presentation on theme: "How does the Dutch Health Facilities Act work? Marinus Verweij MD Director Netherlands Board for Hospital Facilities."— Presentation transcript:

1 How does the Dutch Health Facilities Act work? Marinus Verweij MD Director Netherlands Board for Hospital Facilities

2 Overview The Dutch health care system in a nutshell Financing health investment Tasks of the NBHF Stages of approval Focus on the hospital: planning and building Conclusion

3 Some aspects of the Dutch health care sector social health insurance funds and private hospitals are private trusts hospitals are not for profit organisations ownership of assets belongs to the hospital

4 Ownership health infrastructure - EU

5 Role of the government in health care responsibility laid down in our constitution macro-economic constraints: costs of health care is financed by social security and therefore limited by national and EU budget constraints financial overview of health care delivered and costs presented to the Dutch parliament each year

6 What does this mean for planning and building? Funds for construction are also limited not the investment sum itself is important but the effect on costs –replacement investments: only capital costs rise –investment with expanding capacity: not only capital costs but also an increase in operating costs

7 Financing investments no government subsidies health care institutions do not have much own capital depreciation and interest costs are accepted in the tariffs therefore cost differs between hospitals

8 Financing investments capital costs through the life cycle

9 The Netherlands Board for Hospital Facilities ‘What’s in a name?’: the Act covers more than just hospitals Governors of the NBHF are independent, appointed by the Minister of Health Field parties are represented in committees of the board 120 Employees

10 Tasks of the NBHF licensing of construction plans: health facilities submit their own plans developing guidelines –for planning capacity: e.g. ageing, IC capacity, geographical distribution of emergency care –building guidelines, with basic quality requirements and best practice centre of expertise –technological innovation: e.g. operating theatres –building costs and procurement

11

12

13 Stages of approval procedure the business case (mandatory) the programme of requirements (optional) the architectural design (mandatory) the final specifications for the granting of the license (optional) In recent years a reduction of bureaucracy

14 General planning guidelines Hospitals: 2.8 beds per 1000 Nursing homes: 5% of 75 years and older + 0.08% of total population Psychiatric hospitals: maximum 2.17 per 1000 for institutional care, minimum 1.4 per 1000 Homes for the mentally handicapped: between 1.4 and 1.8 places per 1000 To be used with ‘intelligence’!!

15 Focus on hospitals 70’s and 80’s: two or three hospitals in most cities mergers brought about more economies of scale 90’s mergers between hospitals resulted in very large hospitals ministry wants no more mergers, small hospitals still in difficult situation, private day care clinics allowed

16 The size of a new hospital is determined by the future capacity of beds the specific functions ‘beds’ is a pragmatic parameter, outpatient services have become much more important

17 19734.0 beds per 1000 inhabitants 19813.7 beds per 1000 inhabitants 19883.4 beds per 1000 inhabitants 19962.8 beds per 1000 inhabitants In the future 2.0 beds per 1000 inhabitants The bed/population ratio

18 Which beds are included - general ward - special care - paediatric care - obstetric care - day care Not included - psychiatric care - rehabilitation - Long term stay

19 How to apply the bed/population ratio? future catchment area 200.000 inhabitants bed/population ratio 2,8 beds per 1000 inhabitants future capacity of beds 560 beds

20 Size and cost of a new hospital numbernormfloorcosts total of bedsper bedareaper m² costs 56095 m²53.200 m²€ 2.200 €117 mln

21 What is included in the 95 m²/bed patient accommodation treatment and diagnostics outpatient facilities (para)medical support management and training civil and technical services office accommodation for staff

22 Special hospital functions Not included in the standard 95 m² per bed transplantation (kidney, heart/lung, liver, bone- marrow, pancreas) coronary and open-heart surgery complex neurosurgery radiotherapy neonatal intensive care genetic services and counselling in vitro fertilisation

23 Capacity guidelines radiology  bucky room12.000 investigations  fluoroscopy room 2.500 investigations  sonography room 4.000 investigations  mammography room 3.000 investigations  angiography room 1.200 investigations  CT- room 4.000 investigations  MRI-room 3.000 investigations

24 Other capacity guidelines  operating room1.200 procedures  general treatment room3.500 treatments  GE-scopy/bronchoscopy2.500 treatments  urology room3.000 treatments

25

26

27

28 Conclusion: aim of the H F Act matching supply and demand of healthcare infrastructure well-balanced geographical distribution adequate quality of accommodation at a reasonable cost


Download ppt "How does the Dutch Health Facilities Act work? Marinus Verweij MD Director Netherlands Board for Hospital Facilities."

Similar presentations


Ads by Google