Press Room Strip Inventory Analysis Kyle Jiron IE 496 Spring 2015
3
German based company Purchased American Brass plant of Buffalo in 2006 Manufacturer of rolled metals (brass and copper) Aurubis Buffalo
4
Use lean principles to increase efficiencies in Press Room procedures and reduce waste throughout the system Objective
5
Reduce Press Room strip holding inventory Develop better strip ordering practices Decrease WIP throughout system Project Goals
6
Gantt Chart Project Timeline
7
Current level: 1.4 million lbs Target levels: 800k lbs Revised: 1 mil +/- 200k lbs Holding Inventory
8
521 Coil cuts in holding inventory 1.36 million lbs 121 Cuts aged two months or older 278,634 lbs Holding Inventory
9
Process Map (Light vs. Intermediate vs. Heavy) Lead Times Formula Strip Ordering
10
Light Gauge Orders open for 6+ weeks in advance Process Map (220s) & Lead Times
11
Intermediate Gauge Orders open 5+ weeks in advance Process Map (260s) & Lead Times
12
Heavy Gauge Orders open 4+ weeks in advance Process Map (260s) & Lead Times
13
Order 6 days out 13 bars per order Ordering Formula
14
About 1 million lbs of coil in system throughout slitters and annealers leading up to the Press Room Inventory in System (WIP)
15
Current: 1 million lbs in WIP Goal: 400,000 +/- 150,000 lbs Inventory in System (WIP)
16
Changing the Kanban from being located at the casting area to being located before the 44 roll in the plant New Kanban System