Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~10 -10 Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,

Similar presentations


Presentation on theme: "Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~10 -10 Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,"— Presentation transcript:

1 Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~10 -10 Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed, FV interlock checkNone New dipoleMeasured (<0.03%) + Field Map, Installed, and alignedUpdate control software Dipole Hall probeTesla meter + PC104/cables (com) installedMount probe, PC104 on network Transport magnets2 Quads/LCW + 4 Corrector pairs readyNone Position monitorsGoubau line tested, installed and elec. calibratedNone ViewersInstalledAir line/anti-collision Faraday cupInstalled, LCW, current monitoringAir line/anti-collission RadiatorInstalled, LCW, current monitoringLead hut, ME document thermal anal Photon lineCollimator/Dump installedNone AlignmentPre-alignFinal ~today

2 New spectrometer magnet NMR measurements 1 st pass (<0.03% midplane) 2 nd pass (<0.01% midplane) Hall probe Grid measurements Calibrated to NMR Stretched wire Signal too weak Alignment Fixture plate offset => X = -5mm, Z=1.2mm Dipole chamber roll => Y +0.1mm

3 Faraday Cup to Photon Dump Electron Radiator Final thickness = 0.231 +.003 -.002 “ ME analysis suggests 1kW OK Shielding Pb staged for startup Coordinate alternative w/ RadCon Bremsstrahlung Measurement Detector group may have Ge detector Estimate photon flux

4 Summary New beam line should be ready for the Fall run Commissioning plan should be submitted Checklist of machine protection interlocks and controls Checkout of beam line with electron beam Beam Studies Momentum measurement Bremsstrahlung spectra Operation at high current