1
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials
2
Diverse Roles of Team KEY PLAYERS: -OWNER -ARCHITECT -CONSULTING ENGINEERS -CONSTRUCTION MANAGER
3
Diverse Roles of Team CONTRACTUAL NON-CONTRACTUAL
4
Contractual Roles of Team CONTRACTUAL OTHER CONSULTING ENGINEERS PRIME CONTRACTOR GENERAL CONTRACTOR SUB-CONTRACTORS NON-CONTRACTUAL CONTRACTUAL
5
The Pre-Design Phase *PROGRAMING *ECONOMIC FEASABILITY *SITE ASSESSMNET *GOVERNMENTAL CONSTRAINTS *DESIGN TEAM SELECTION
6
The Design Phase *SCHEMATIC DESIGN or SD *DESIGN DEVELOPMENT or DD *CONSTRUCTION DOCUMENT or CD
7
The Pre-Construction Phase *COMPETITIVE BIDDING *INVITATIONAL BIDDING *NEGOTIATED CONTRACTS *MULTIPLE PRIME CONTRACTS
8
The Construction Phase *PROPOSE ACCURATE & COMPETITIVE BIDS *PREPARE DETAILED SUBMITTALS FOR APPROVAL *BUILD THE BUILDING & CONSTRUCTION ADMINISTRATION
9
The Post-Construction Phase *SUBSTANTIAL COMPLETION *CERTIFICATE OF FINAL COMPLETION *RECORD DOCUMENTS
10
The Owner’s CM is hired to intercept and resolve issues inherent to the design and construction of a building
11
Prime Mechanical Contractors
12
Prime Electrical Contractors
13
Prime General Contractors