NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010
2
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 2 1.Work Breakdown into Work Packages and partners 2.Study Logic 3.Deliverables 4.Schedule Introduction
3
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 3 Work Breakdown structure
4
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 4 Work Breakdown into WP and Partners Man Month
5
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 5 Study Logic
6
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 6 Study Logic
7
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 7 Deliverables Formal deliverables to EC List will be maintained by Coordinator deliverable under WP responsabilities, provided to Coordinator for validation and delivery to EC Each deliverable under WP responsabilities, provided to Coordinator for validation and delivery to EC The T0+6/12M deliverables list is recalled in the next slides → The T0+6/12M deliverables list is recalled in the next slides Internal deliveries followed by the coordinator: To ensure the smooth running of the project have access of the correct level of monitoring To have access of the correct level of monitoring Process of monitoring of the internal deliverables is illustrated with examples → Process of monitoring of the internal deliverables is illustrated with examples
8
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 8 Formal Deliverables Del. no.Deliverable name Lead beneficiary Dissemination level Delivery date D0.1Project presentation (M 0) NOV PUKick-Off Meeting D300.2Report on all data stream that CARBONES could benefit + Assessment of the accessibility and of the necessary mechanisms to grant the access. MPI-BGC PU First version → Kick-Off Meeting D120.1CUAG meeting #1 minutes METO PUT0+5 → 1st September, 2010 D120.2User requirements report V0 METO PUT0+5 → 1st September, 2010 D210.1System Requirements synthesis and justification TASF PU T0+6 → 1st October, 2010 D220.2Document on the complementarities with other EU/National projects and outside Europe if relevant. TASF PU T0+6 → 1st October, 2010 D230.1Scientific tools and architecture definition Document including Data models, Engineering Point of View V0,V1 TASF PU Version 0 at T0+6 → 1st October, 2010 D220.1Services/Product Definition V0, V1 TASF PUVersion 0 at T0+6 → 1st October, 2010 D720.1Market assessment reports 1, 2, 3 AEA CO Version 0 at T0+6 → 1st October, 2010 T0 → T0 + 6 months
9
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 9 Formal Deliverables Del. no.Deliverable name Lead beneficiary Dissemination level Delivery date (proj. month) D410.1Description document of the CCDAS, V1, V2 LSCE PU Version 1 at T0+8 → 1st December 2010 D230.1Scientific tools and architecture definition Document including Data models, Engineering Point of View V0,V1 TASF PU Version 1 at T0+12 → 1st April 2011 D300.1CARBONES input and forcing data presentation document, V1 MPI-BGC PU Version 1 at T0+12 → 1st April 2011 D430.1CCDAS validation : Error estimations: Parameter errors on base configuration LSCE PU Version 1 at T0+12 → 1st April 2011 D430.2CCDAS validation : Error estimations: Errors on output fields LSCE PU Version 1 at T0+12 → 1st April 2011 D510.1CARBONES dataset V0 NOV PU Version 0 at T0+12 → 1st April 2011 D520.1CARBONES portal description : simplified version V0 CERC PU Version 0 at T0+12 → 1st April 2011 D720.3Business development plans, 1, 2, 3 AEA CO Version 1 at T0+12 → 1st April 2011 T0 + 6 months → T0 + 12 months
10
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 10 Internal Deliveries For the good running of the project, internal deliveries will be followed by NOVELTIS. For that, each partner has to: → sent their documents with NOVELTIS in copy. → sent an email to NOVELTIS informing the data delivery with the reference. Examples of internal deliveries: For data: Input data from the data providers to CCDAS responsible. Example of CCDAS output data for the CARBONES portal development. For document: The specification document of the post-processing of the CCDAS outputs for the CARBONES portal
11
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 11 Project Schedule MeetingDate Organised by Place Kick-Off Meeting 10-11 May 2010NOVELTISToulouse, France CUAG Consultation Meeting September 2010METOTBD Progress Meeting # 1 October 2010 Progress Meeting # 2 April 2011LSCEParis, France User Workshop #1 and CUAG meeting #2 September 2011AEA Mid Term Review Meeting October 2011 Progress Meeting # 3 April 2012 Progress Meeting # 4 October 2012LSCEParis, France User Workshop #2 and CUAG meeting #3 December 2012METO Final Meeting April 2013NOVELTISToulouse, France