NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.

Similar presentations


Presentation on theme: "NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010."— Presentation transcript:

1 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010

2 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 2 1.Work Breakdown into Work Packages and partners 2.Study Logic 3.Deliverables 4.Schedule Introduction

3 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 3 Work Breakdown structure

4 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 4 Work Breakdown into WP and Partners Man Month

5 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 5 Study Logic

6 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 6 Study Logic

7 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 7 Deliverables  Formal deliverables to EC  List will be maintained by Coordinator deliverable under WP responsabilities, provided to Coordinator for validation and delivery to EC  Each deliverable under WP responsabilities, provided to Coordinator for validation and delivery to EC The T0+6/12M deliverables list is recalled in the next slides → The T0+6/12M deliverables list is recalled in the next slides  Internal deliveries followed by the coordinator:  To ensure the smooth running of the project have access of the correct level of monitoring  To have access of the correct level of monitoring Process of monitoring of the internal deliverables is illustrated with examples → Process of monitoring of the internal deliverables is illustrated with examples

8 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 8 Formal Deliverables Del. no.Deliverable name Lead beneficiary Dissemination level Delivery date D0.1Project presentation (M 0) NOV PUKick-Off Meeting D300.2Report on all data stream that CARBONES could benefit + Assessment of the accessibility and of the necessary mechanisms to grant the access. MPI-BGC PU First version → Kick-Off Meeting D120.1CUAG meeting #1 minutes METO PUT0+5 → 1st September, 2010 D120.2User requirements report V0 METO PUT0+5 → 1st September, 2010 D210.1System Requirements synthesis and justification TASF PU T0+6 → 1st October, 2010 D220.2Document on the complementarities with other EU/National projects and outside Europe if relevant. TASF PU T0+6 → 1st October, 2010 D230.1Scientific tools and architecture definition Document including Data models, Engineering Point of View V0,V1 TASF PU Version 0 at T0+6 → 1st October, 2010 D220.1Services/Product Definition V0, V1 TASF PUVersion 0 at T0+6 → 1st October, 2010 D720.1Market assessment reports 1, 2, 3 AEA CO Version 0 at T0+6 → 1st October, 2010 T0 → T0 + 6 months

9 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 9 Formal Deliverables Del. no.Deliverable name Lead beneficiary Dissemination level Delivery date (proj. month) D410.1Description document of the CCDAS, V1, V2 LSCE PU Version 1 at T0+8 → 1st December 2010 D230.1Scientific tools and architecture definition Document including Data models, Engineering Point of View V0,V1 TASF PU Version 1 at T0+12 → 1st April 2011 D300.1CARBONES input and forcing data presentation document, V1 MPI-BGC PU Version 1 at T0+12 → 1st April 2011 D430.1CCDAS validation : Error estimations: Parameter errors on base configuration LSCE PU Version 1 at T0+12 → 1st April 2011 D430.2CCDAS validation : Error estimations: Errors on output fields LSCE PU Version 1 at T0+12 → 1st April 2011 D510.1CARBONES dataset V0 NOV PU Version 0 at T0+12 → 1st April 2011 D520.1CARBONES portal description : simplified version V0 CERC PU Version 0 at T0+12 → 1st April 2011 D720.3Business development plans, 1, 2, 3 AEA CO Version 1 at T0+12 → 1st April 2011 T0 + 6 months → T0 + 12 months

10 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 10 Internal Deliveries  For the good running of the project, internal deliveries will be followed by NOVELTIS. For that, each partner has to: → sent their documents with NOVELTIS in copy. → sent an email to NOVELTIS informing the data delivery with the reference.  Examples of internal deliveries:  For data:  Input data from the data providers to CCDAS responsible.  Example of CCDAS output data for the CARBONES portal development.  For document:  The specification document of the post-processing of the CCDAS outputs for the CARBONES portal

11 NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 11 Project Schedule MeetingDate Organised by Place Kick-Off Meeting 10-11 May 2010NOVELTISToulouse, France CUAG Consultation Meeting September 2010METOTBD Progress Meeting # 1 October 2010 Progress Meeting # 2 April 2011LSCEParis, France User Workshop #1 and CUAG meeting #2 September 2011AEA Mid Term Review Meeting October 2011 Progress Meeting # 3 April 2012 Progress Meeting # 4 October 2012LSCEParis, France User Workshop #2 and CUAG meeting #3 December 2012METO Final Meeting April 2013NOVELTISToulouse, France


Download ppt "NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010."