Presentation is loading. Please wait.

Presentation is loading. Please wait.

By: Andrew Kim and Pat Wong

Similar presentations


Presentation on theme: "By: Andrew Kim and Pat Wong"— Presentation transcript:

1 By: Andrew Kim and Pat Wong
The Sunniberg Bridge By: Andrew Kim and Pat Wong

2

3

4

5

6

7

8

9

10

11 Bridge Name Bridge Type: Year: Total Length: Cost: Cost/Length Ratio Sunniberg Bridge Prestressed concrete, extra-dosed 1998 526 m $16.6 mil $ /meter King Hussein's Bridge 1999 110 m $9.7 mil $ /meter Odawara Blueway Bridge 1994 270 m $18 mil $ /meter Zakim Bunker Hill Bridge Steel, cable-stayed 2005 227 m $115 mil $ /meter ANZAC Bridge 1996 805 m $62 mil $77018 /meter

12 “From an engineer’s point of view, it is inconceivable to accept flaws in the structural system and details of disproportionately high cost in return for architectural embellishment. The art of the structural engineer consists of balancing economy and elegance against each other on a case by case base, to achieve the desired objectives.”

13


Download ppt "By: Andrew Kim and Pat Wong"

Similar presentations


Ads by Google