Download presentation
Presentation is loading. Please wait.
Published byNatalie Rose Modified over 9 years ago
1
1 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 ENGINEERING ROLE IN NAVOCEANO SHIP’S ENVIRONMENT Procurement of New Systems. Configuration Management. Installation Testing and Final Acceptance Ship Modifications (Re-designs) Training Maintenance New Technology
2
2 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 T-AGS-60
3
3 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
4
4 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MARY SEARS SONAR SYSTEMS EM121A – 12 KHZ DEEP WATER MULTIBEAM EM1002 – 95 KHZ SHALLOW WATER MULTIBEAM SUBBOTTOM PROFILER – 3.5 KHZ FM AND CW DUAL FREQUENCY SINGLE BEAM – 12 & 33 KHZ EM3000 (HSL) – 300 KHZ SINGLE ARRAY MULTIBEAM EA502 – DUAL FREQUENCY SINGLE BEAM BROAD BAND ADCP – 150 KHZ
5
5 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
6
6 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
7
7 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
8
8 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
9
9 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
10
10 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
11
11 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
12
12 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
13
13 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
14
14 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
15
15 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 RECEIVER RACK
16
16 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 TRANSMITTER RACK
17
17 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 OPERATOR CONSOLE
18
18 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 DPC MONITORS
19
19 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
20
20 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
21
21 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121A Projector Installation
22
22 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM-121A PROJECTORS
23
23 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 INSTALLATION
24
24 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 TESTING CONDUCT PERIODIC ACOUSTIC TESTING TO MAINTAIN HIGH LEVELS OF PERFORMANCE FOR ACOUSTIC SYSTEMS - SEVERE BUBBLE SWEEP DOWN - FAILED INITIAL AT-SEA TEST VERY HIGH FLOW NOISE
25
25 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 FINAL ACCEPTANCE TEST ADDED BUBBLE FENCES MODIFIED APPENDAGE FAIRING FLOW NOISE REDUCED TO 49 Db PASSED SAT EXCEPT FOR SHALLOW WATER ACCURACY SIMRAD REDUCED OUTER BEAM ARTIFACTS
26
26 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 INSTALLATION OF BILGE KEELS
27
27 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 BUBBLE SWEEPDOWN FENCES
28
28 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 POST YARD SHAKEDOWN START A LOG OF EVENTS INCLUDING ENVIRONMENTAL CONDITIONS, ETC VERIFY THAT ALL INSTALLATION PARAMETERS AND OFFSETS ARE CORRECT VERIFY THAT HARDWARE IS OPERATING CORRECTLY (BITE TEST) COMPARE CTD PROFILE WITH SSSV SURF DATA/SV PROFILER PERFORM SYSTEM CALIBRATION CONDUCT SMALL AREA SURVEY WITH CROSSING LINES AND 50% OVERLAP EDIT AND PROCESS DATA FOR ACCURACY AND ARTIFACTS DOCUMENT SYSTEM CONFIGURATION MAKE SYSTEM BACKUPS WRITE REPORT ON RESULTS
29
29 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 AVERAGE TIME FRAME FOR A TYPICAL PROCUREMENT AND INSTALLATION OF A MULTIBEAM SYSTEM ON A TAGS-60 CLASS SHIP ( 3 YEARS ) PROCUREMENT ( 12- 24 MONTHS) INSTALLATION ( 4 MONTHS) CONDUCT A SHIPCHECK. DEVELOP AND SUBMIT SPECIFICATIONS TO MSC AND BIDDERS / CONTRACT AWARD. ACTUAL INSTALLATION (1 MONTH). TESTING AND TRAINING (2 MONTHS - OPTIMISTIC APPROACH) CONFIGURATION MANAGEMENT AND DOCUMENTATION.
30
30 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE AND HOUSEKEEPING ISSUES SIGNIFICANT TRANSDUCER FOULING HAS BEEN OBSERVED ON SHIPS. SIGNIFICANT ACOUSTIC WINDOW FOULING HAS BEEN OBSERVED ON SHIP.S SONAR FAIRING DAMAGE HAS BEEN NOTED ON T-AGS-CLASS SHIPS.
31
31 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE - ADCP TRANSDUCER
32
32 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE / DOMES
33
33 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121 RECEIVE ARRAY MAINTENANCE
34
34 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 REFURBISHED SONAR DOMES
35
35 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM-1002/1000 TRANSDUCER
36
36 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE
37
37 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE CONCLUSIONS AND RECOMMENDATIONS SONAR PERFORMANCE IS CONSIDERABLY DEGRADED DUE TO UNDERHULL CONDITIONS. ANY INSTALLATION SHOULD CONSIDER AND INSTITUTE UNDERHULL MAINTENANCE PROGRAMS TO PERIODICALLY GROOM SHIPS TO OPTIMIZE SONAR PERFORMANCE
38
38 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 FUTURE PLANS “SONAR REPLACEMENTS” EM121A STARTING FY06 SUB-BOTTOM PROFILER FY06 EM1002 FY08
39
39 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121A REPLACEMENT REQUIREMENTS 1 X 1 DEGREE FULL OCEAN DEPTH MINIMUM OF 190 BEAMS 150 DEGREE SWATH COVERAGE 0.1 % ACCURACY OUTPUT DEPTH, IMAGERY, RAW HYDROPONE ROLL, PITCH, HEAVE, YAW COMPENSATED INSTALLATION OPTIONS “V” RECESSED IN HULL FLAT ARRAY ON WING INTEGRATED SUBBOTTOM PROFILER
40
40 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 The following slides show a typical installation of a EM120 Deep Water Multibeam Includes a narrow beam subbottom profiler that uses the same receive array as the multibeam. Underhull appendage is slightly more than that on a T-AGS 60 ship. This gondola arrangement also includes all of the other transducers mounted on the existing T-AGS 60 This is one of several installation methods that N61 is considering for the EM121A replacement.
41
41 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
42
42 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
43
43 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
44
44 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.