Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road.

Similar presentations


Presentation on theme: "1 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road."— Presentation transcript:

1 1 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road InfrastructureTransport and Comm’s Other Tourist Infrastructure Product Development & Mktg Other Initiatives NP-7C Clark-Subic - Tarlac 1.Develop East Circumferential Road, Upgrade Magalang Angeles Road, 2.Road widening of West Circumferential Road (Friendship highway) up to 4 lanes, 3.Development of inter municipality road from San Simon to Mabalacat 4.Improve the Tarlac Sta. Julianna Road; the Tarlac- Iba Road; 5.Widening of Olongapo-Gapan Road 6.Develop and implement consolidated road improvement packages for Subic, Clark and the provinces in between, namely: Zambales; Bataan; Pampanga; Tarlac 7.In the Angeles and Clark City area (MICE, Medical & Retirement Tourism precinct) 8.Prepare Traffic Reforms and traffic management Plan 9.Adoption and implementation of the proposed Subic-Clark-Tarlac Corridor Roadmap Plan (note: currently done by SCAD, REID, MACCI and DOT Reg. 3) 10.Road development, signage 1.In the Angeles and Clark City area (MICE, Medical & Retirement Tourism precinct) improve Internet connection; clearing of Rail Road Alignment on Manila North Rail Transit, and prepare Traffic Reforms and traffic management plan 2.Improve Internet connection in the Pampanga, Tarlac, Subic - Olongapo, Nueva Ecija, Bulacan, Zambales areas Site Infrastructure 1.Establish and operate a Tourism Information Center 2.In the Angeles and Clark City area (MICE, Medical & Retirement Tourism precinct) develop ecological /Biological Parks 3.Restore Rail Station at San Fernando, 4.Develop flood control outlet in the Pampanga area 5.Develop Cultural and Heritage Museums at Mt. Arayat, and San Fernando 6.Undertake flood control works for Malolos-Calumpit and Bocaue to Marilao, Meycauyan and Obando Clearing of river banks for river cruise (Plaridel – Calumpit – Pulilan Other Infrastructure Needs: 1.Solid Waste Management Product Development: 1.Undertake single destination marketing effort such as the creation of one iconic product: Agro-Ecotourism Product/Services (Agro- production Showcases); Sports Tourism (Cable/Zip or Tramlines, Bike lanes, trekking paths); Cultural tourism / History tourism; Culinary Tour (standardize food services and facilities) Undertake Cultural Mapping 2.Establish entity to attract and manage investors & investments 3.Develop wetlands into tourist destinations (birdwatching, etc.) 4.Establish pasalubong centers Human Resource Development: 1.Strengthen and further develop tourism institutions Hire permanent Tourism Officers; Harmonize policies with regard to land use (e.g. CADT, IPRA, IFMA and national parks) Coordinate the operations and management of all identified and existing tourism development areas Introduce standardization/ accreditation system for accommodation facilities Initiate local legislation to support tourism efforts 2.Train tour guides 3.Establish Tourism Zones NP-7E Bulacan 1.Clearing and improvement of roads leading to sites e.g. Biak naBato 1.__NA Site Infrastructure 1.__NA Other Infrastructure Needs: 1.Solid Waste Management Product Development: 1.__NA Human Resource Development: 1.Training tour guides Other Initiatives 1.Entity to attract and manage investors & investments Tourism Activity Theme: Entertainment/Amusement-Sport-Beach Resort-Events-Sightseeing-MICE-Ecotourism-Wellness and Medical Tourism- Retirement Tourism/Cultural Heritage

2 2 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road InfrastructureTransport and Comm’s Other Tourist Infrastructure Product Development & Mktg Other Initiatives NP-7A Nueva Ecija 1.Widening/re-gravelling of 2.1 kms road leading to hotspring in BgryCadaclan in Pantabangan 2.Opening/re-gravelling of 5 kms road leading to Ditabuyan fall in BrgyNapon- in Pantabangan 3.Improve road network leading to Minalungao Natl Park 1.Improve connectivity (Internet) 2.Improve telecom Site Infrastructure 1.__NA Other Infrastructure Needs: 1.Solid Waste Management Product Development: 1.Renovation of Minalungao National Park (clubhouse and park area) 2.Establish pasalubong center Human Resource Development: 1.Training for tour guides and frontliners NP-7B Zambales Coast 1.Improve roads leading to resort areas1.Connectivity (Internet) 2.Improve telecom Other Infrastructure Needs: 1.Solid Waste Management 1.Local tour packaging 2.Establish tourist info center 3.Develop island resorts (Potipot Island, Miss Universe) / invite private investors 1.Training programs (tour guides, homestay program, resort owners) NP-7D Bataan Coast & Hinterland 1.Improvement of Mariveles-Bagac Road leading to Beach Resorts along South China Sea in Bagac and Morong and Pawikan Conservation Center Improve access Road going to Limutan Falls in Bagac 1.Improvement of drainage and sewerage system in Balanga City 2.Provide solid waste management at all sites 1.Provision of souvenir shops Tourism Activity Theme: Entertainment/Amusement-Sport-Beach Resort-Events-Sightseeing-MICE-Ecotourism-Wellness and Medical Tourism- Retirement Tourism/Cultural Heritage


Download ppt "1 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road."

Similar presentations


Ads by Google