Railway Development in Ottawa From Colonel By to the O Train Part 4 1960 - 1980 Colin J. Churcher
2
Ottawa Area
3
Periods of Development 1850-1875 Early local railways. 1875-1895 Part of national network. 1890-1925 Consolidation of companies. 1925-1950 Commencement of route reduction. 1950-1970 Elimination of cross town tracks and rationalization. 1970-1995 Reduction of the network. 1995 to date Rise of short lines and the O Train. These dates are approximate and overlap each other.
4
1960-1
5
1960-2 CN abandons Uplands spur
6
1961
7
1962
8
1963-1
9
1963-2
10
1964 CP abandons Sussex St. to Beechwood
11
1965 CN abandons Chaudiere line
12
1966-1 Hawthorne connection opened.
13
1966-2 CP abandons Sussex St. Beechwood to Hurdman
14
1966-3
15
1966-4
16
1966-5
17
1966-6
18
Local Passenger Train Reductions 1939 Ottawa – Hawkesbury 1954 Ottawa – Cornwall – Helena NY. 1957 Ottawa – Prescott 1959 Ottawa – Waltham 1961 Ottawa – Barrys Bay 1962 Ottawa – Chalk River 1963 Ottawa – Maniwaki
19
Inter City Passenger Train Reductions 1970 Ottawa – Montreal via south shore 1978 CN Supercontinental 1981 Ottawa – Montreal via north shore 1990 VIA “The Canadian”
20
1966-7
21
1966-8
22
1966-9
23
1967-1 Laman connection opened
24
1967-2
25
1967-3
26
1967-5
27
1967-6
28
1970
29
1972-1 CPR Ellwood wye
30
1972-2 CNR Ramsayville spur
31
1975 CPR Hull spur
32
End of Part 4 See Part 5