Download presentation
Presentation is loading. Please wait.
Published byEdmund McCarthy Modified over 9 years ago
1
TOWARDS GREENISH WORLD TRITECH INTERNATIONAL HOW WE IMPLEMENT KAIZEN
3
OUR LOCAL MARKETING STRATEGY Start sales outlet at Colombo-11 5 Distributors deliver & sell our products Island wide Participate Exhibitions at BMICH Through Our Web Site
4
Obtain 1st place for Electrical & Electronic Category at “ SHILPA 2011” conducted by Industrial Development Board Obtain 1st Place for Electrical & Electronic Category at “ SHILPA 2012” conducted by Industrial Development Board Obtain 1st Place for Electrical & Electronic Category at “ SHILPA 2014” conducted by Industrial Development Board OUR ACHIEVEMENTS
5
Obtain 1st place for Furnishing-Interior architecture field at “Sahasak Nimavum 2012” conducted by Inventors commission Obtain 2nd place for Commercial, Industrial & Office Equipment field at “Sahasak Nimavum 2012” conducted by Inventors commission Obtain 3rd place for Energy field at “Sahasak Nimavum 2012” conducted by Inventors commission
6
` Selected for “Top 20” at “INTEL DST Asia Pacific Challengers” Inventors competition held in Bangalore, India
7
Thanks APO & NPS giving opertunity Participate to Solar Power Maga Projects workshop at Japan conducted by APO
8
Well-Motivated Factory Staff Well-Motivated Factory Staff Good Customer Base Good Customer Base Mentors Support Mentors Support Technical Knowhow Technical Knowhow Business contacts Business contacts Ability to do New Design within few days Ability to do New Design within few days Well Equipped with Laboratory Well Equipped with Laboratory Well Equipped Research & Design section Well Equipped Research & Design section OUR STRENGHTS
9
OUR MENTORS NATIONAL PRODUCTIVITY SECRETARY INVENTORS COMMISSION INDUSTRIAL DEVELOPMENT BOARD
10
HOW NPS HELP US CONDUCTING KAIZEN MANAGER PROGRAM CONDUCTING MORTIVATIONAL PROGRAM LEADERSHIP & PERSONALITY IMPROVEMENT PROGRAM ARRANGE SCHOLARSHIPS TO ATTEND IPORTANT INETRNATIONAL WORKSHOPS
11
Shall we see how our staff Practice KAIZEN ? 3 Days/week (Monday, Wednesday, Friday) our staff hold KAIZEN meeting from 7.30- 8.00AM by their own time 3 Days/week (Monday, Wednesday, Friday) our staff hold KAIZEN meeting from 7.30- 8.00AM by their own time They discuss about Strengths & Weaknesses They discuss about Strengths & Weaknesses Discuss about production problems & New Improvement Discuss about production problems & New Improvement
12
Here you can see our CNC machine use for Engrave PCB
13
You can see the Engraving Tool This tool was Very Expensive specially made for this machine & Price is about Rs. 500.00
14
They change the Tool & Fix the 1mm Drill bit with Small chuck which use for Jewellery making(Chuck is about Rs.200.00) They change the Tool & Fix the 1mm Drill bit with Small chuck which use for Jewellery making(Chuck is about Rs.200.00) Price of drill bit very cheap only Rs. 25.00 Price of drill bit very cheap only Rs. 25.00 And it can re-use after sharpening And it can re-use after sharpening Cost for tool Cost for tool Before 5 tools/Month = Rs.2500.00 Before 5 tools/Month = Rs.2500.00 Now 2 Tools/Month = Rs. 50.00 Now 2 Tools/Month = Rs. 50.00
15
Tool cost reduction rate 50:1 Before After
16
Solar Battery Box Bending This bender Needed 3 People
17
Our staff members prepare a wooden bed, then no need to Hold the sheet And They change Handle & Extend it to Foot operated pedal
18
Now one person can operate the machine IT SAVES 2/3 OF PRODUCTION TIME IT SAVES 2/3 OF PRODUCTION TIME
19
Some type of light Fixture manufacturing we needed prepare following sheet forming
20
For that our team Designed & Fabricate This type of Bender
21
Now it’s very easy to Roll like this It’s very easy to handle & Fabrication Cost about Rs. 400.00
22
Initially wire preparation did like this. It cost more time & quality is very poor
23
Now it’s very easy 70% time saving Quality of final product is really good
24
THE END Thank you !!!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.