Download presentation
Presentation is loading. Please wait.
Published byBernard Franklin Modified over 9 years ago
1
1 Cary Wayfinding Program Town Council Worksession #2 February 23, 2010 Juliet Andes, Planning Doug McRainey, PRCR John Bosio, Merje
2
2 AGENDA Refresher of Preliminary Design Review Open House Comments Design Development / Full Menu of Signs Next Steps/Implementation
3
3 DOWNTOWN CARY CONCEPT DEVELOPMENT
4
4 PRCR Wayfinding Plan Town of Cary Wayfinding Plan Downtown Wayfinding Plan
5
5
6
6
7
7 DOWNTOWN CARY PUBLIC COMMENTS
8
8
9
9
10
10
11
11 DOWNTOWN CARY DESIGN DEVELOPMENT
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22 Citizen Advisory Committee Unanimous approval of proposed downtown design Desire to include banners in design plan and incorporate downtown logo onto sign brackets Mentioned potential need to “copyright” wayfinding colors to prevent private use –Possible component of the Sign Ordinance update
23
23 Mock-Ups / Prototypes NCDOT approval Construction Documentation Sign Locations / Messages REMAINING PHASES Fabrication & Installation
24
24 Downtown Prototype Prototype fabrication –Build prototypes for use with Cary Elementary Renovation Proposed signs to include: –Entrance sign –Parking sign
25
25 Preliminary Cost Estimates: Downtown Fabrication and installation –Full menu of signs within TCAP: $351,225 –Downtown trailblazer signs outside TCAP: $76,500 –Banners (75):$26,250 –Town Hall campus signs: $42,000 Currently budgeted for 2012 –Potential to phase signs by type based on status of Streetscape Implementation
26
26 Preliminary Cost Estimates: Townwide Completion of Design $15,000 Fabrication and installation –Phase I (Venues - 19 Signs) $85,500 –Phase II – 14 Signs $63,000 –Phase III – 21 Signs $94,500 Total - $243,000
27
27 Approval of the Design Development Package (final design approval) Consideration to build prototypes Implementation status: Downtown wayfinding: - currently budgeted to begin implementation in 2012 Town-wide wayfinding STAFF RECOMENDATIONS
28
28 Council Discussion/Direction Final Design Approval Proceed with Sign Mock-Ups (Yes/No) Implementation Status
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.