1
MAY1010 BLANE CHESNUT CHRIS DONNELLY ADAM RASMUSSEN JOHN PRITCHARD ZACH BRUCE ADVISOR: DR. AHMED E. KAMAL CLIENT: DIGI Wireless Mesh Bear Tracking
2
Project Plan GPS Unit on bear collars Collar transmits GPS location via VHF frequency to land- based routing units Routing units relay collar location information to a remote end user
3
Project Design Collar units and routing units will contain the same hardware. PIC will be programmed differently according to the desired unit.
4
Implementation/Testing Parts All parts have been sampled and purchased. We have received all parts defined in our design document 4
5
Implementation/Testing Phone conference with Digi twice. PCB/Layout All schematics and layout have been completed. Layout sent for fabrication on February 15 th, received February 24 th. Will be making 2 units 5
6
Implementation/Testing Programming MPLAB program and all compilers installed Have two programmers PICkit2 and a Microchip Puck. PIC – defining pins required and how we will set them up Understanding PIC, Tx/Rx, GPS communication 6
7
Implementation/Testing Hardware Basic electrical tests Matching Network verification Communication PIC communication with Tx/Rx, USB, GPS, etc. Unit-to-unit communication Signal strength through highly dense area 7
8
Schedule 8 PCB ordered – Received February 24th Boards populated by March 15th Programming Initialization by February 22 nd Communication by March 1 st Communication – Unit to Unit by April 14th Project Poster due by April 14 th Design Report due by April 28 th