Download presentation
Presentation is loading. Please wait.
Published byIrene Wilkinson Modified over 9 years ago
1
First installation of SOLARSPOT D900 CTT MAYA – PORTUGAL 14.000 mq for the main distribution of the Portuguese mail service 206 system installed, in a successful combination of SOLARSPOT 900 and 650 mm Inspection done during very bad meteorological condition (storm that have shocked the Portugal area). The illuminance of the sky was less than 4.000 lux, but the measurements made inside the building shown that, using our systems, was largely satisfied the daylight factor of 1%. The site is not yet finished, the floor is not done and at its place there is the brown dark ground, as for the walls that are not painted. We expect at job finished, that the value will be higher. The Work Supervisor, the builder and the customer have already show their appreciation about the great results achieved.
7
D650D900
11
Some D530 mm employed in a smallest area where will be installed a false ceiling.
14
SOLARSPOT 900 Dome detail (detail also of the sky condition)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.