Presentation is loading. Please wait.

Presentation is loading. Please wait.

UCB Update Jason McPhate & Sharon Jelinsky LAPP Tuesday Telecon 29 March 2011.

Similar presentations


Presentation on theme: "UCB Update Jason McPhate & Sharon Jelinsky LAPP Tuesday Telecon 29 March 2011."— Presentation transcript:

1 UCB Update Jason McPhate & Sharon Jelinsky LAPP Tuesday Telecon 29 March 2011

2 New 33mm, 20µm INCOM Substrates Dramatic improvement over previous substrates! Triple points and voids seem to have been eliminated (or certainly greatly reduced) Pore crush zone near multi-fiber boundaries reduced – appears to affect only one pore either side No apparent striping within the multis from single stacking Photos and more details forthcoming – need to verify INCOM is okay with content being posted 29 March 2011J. McPhate – LAPP Tuesday Telecon2

3 33mm MCP Transport One of two substrates arrived with marring from the transport retainer spring Likely caused by non-flatness of laser-cut inner parts (spacers and springs) making it difficult to stack without the possibility of shifting Also, laser-cut edges are rough and serrated We have priced out making these parts via photo-chemical milling (etching) and found the pricing rather low Pricing for XX sets (each set is 2 springs, 2 spacers) – Set of 10:$1650 ($165 /set) – Set of 100:$1966 ($19.66 /set) – Set of 1000:$8750 ($8.75 /set) 29 March 2011J. McPhate – LAPP Tuesday Telecon3

4 High-temp Life Test Setup Nearly all the parts for 2 each XDL and phosphor detectors with the capability of full temp bakeout are in house. Need flanges and adapter rings (all in fab now) for phosphor. All parts for 1 XDL detector in house Have begun bakeout testing of one of the detector pots on the life test octopus 29 March 2011J. McPhate – LAPP Tuesday Telecon4

5 High-temp Life Test (cont) 29 March 2011J. McPhate – LAPP Tuesday Telecon5 Empty detector pot with heater bands on Variacs High-temp detector pot, with thermal blanket Low-temp life test still running (for now)

6 8” Photocathode Chamber 29 March 2011J. McPhate – LAPP Tuesday Telecon6 Change from small cathodes to large cathodes continues to progress New chamber for 8” cathodes mounted on oven base Needs more vacuum plumbing and manipulators Chimney and window nest parts are out for fabrication

7 Bits and Pieces Received first OFHC copper indium well for 8” tube – Looks good to first order – Some issues with parting, leaves tabs behind – Stamper has resolved this for further parts – Will run remaining material – about 100 parts Will be running a smaller batch from Kovar – We believe this will be the most likely material final tube – Better CTE match to ceramic – About 20 parts 29 March 2011J. McPhate – LAPP Tuesday Telecon7

8 Bits and Pieces 29 March 2011J. McPhate – LAPP Tuesday Telecon8 First-off, 8.66” indium well (OFHC copper) 4.5”,.100” thick ceramic anode test blank with SMA feedthrough holes 2 sent to Hervé for impedance, cross talk, dissipation, etc. testing. A cleanly cut corner, minimal burrs Bad part – big tab


Download ppt "UCB Update Jason McPhate & Sharon Jelinsky LAPP Tuesday Telecon 29 March 2011."

Similar presentations


Ads by Google