Download presentation
Presentation is loading. Please wait.
Published byMyra Mathews Modified over 9 years ago
1
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”
2
2 CONTENTS 1.Process of selecting decommissioning records 2.The records management system 3.Quality assurance programs
3
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”3 TRAINING OBJECTIVES Upon completion of training trainees should be able to: Describe the scope of the data that have to be recorded during decommissioning. Describe the process of records selection. Explain the purpose and scope of records management system. Explain the purpose and scope of QA programs.
4
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”4 SCOPE OF DOCUMENTATION AND INFORMATION Documents and data for field changes; Design documentation with changes; Results from surveys; Reports on nuclear material status; Information for radioactive and other noxious waste and substances; List of systems and equipment that are source of ionizing radiation; Documentation and data for status and maintenance or for decommissioning activities and dismantling of systems and equipment that are safety related.
5
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”5 TYPES OF INFORMATION According to information source: design, construction and modification data; operating, shutdown and post-shutdown data. According to groups at registering and archiving: operation data; decommissioning data; data from completion of decommissioning.
6
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”6 CHARACTERISTICS OF DOCUMENTS DESIGNATED FOR ARCHIVING Requirements for registration; Type of documents; Term of storage; Document developer; Individual responsible for storage of the document; Information bearer/medium; Storage place.
7
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”7 PROCESS OF SELECTING DECOMMISSIONING RECORDS Establishing the RMS Selection of decommissioning records Auditing of the RMS Documentation prepared for decommissioning
8
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”8 THE RECORDS MANAGEMENT SYSTEM Requirements and responsibilities Identification of records, including validating data sources Transmittal, receipt and acceptability of the records Record indexing and information retrieval Record retention classification
9
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”9 THE RECORDS MANAGEMENT SYSTEM - CONTINUED Record medium and location: paper; microfilms; electronic record medium of information; read - only electronic record media. Protection of records from adverse environments Access control Control of modifications, revisions and the archiving of records Periodic reproduction or transfer between media National and international archive requirements
10
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”10 PROJECT MANAGEMENT SYSTEM
11
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”11 REQUIREMENTS FOR RECORD MEDIA It should be capable of capturing and storing the required information; It should have physical and chemical stability; It should be capable of being easily copied or transferred to another medium, without loss of information; It should be retrievable over extended periods of time; It should be readable and clear; It should be resistant to alteration by unauthorized individuals.
12
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”12 RECORD MEDIUM
13
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”13 REQUIREMENTS FOR QUALITY ASSURANCE SYSTEM Quality assurance system needs to ensure: planning, preparation and coordination of decommissioning activities; development of plans; stipulation of term and conditions for beginning of decommissioning works; establishment of equipment identification and marking system; regulated and controlled conditions of spent fuel management; regulated and controlled conditions for radioactive waste management.
14
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”14 REQUIREMENTS FOR QUALITY ASSURANCE SYSTEM - CONTINUED In case decommissioning activities are performed by a permit holder, not by the operating organization: identification and recording of nonconformities and other issues; completeness of working documentation; turning-over of responsibility to permit holder; nuclear facility status identification at the moment of turning-over.
15
Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”15 REFERENCES Decommissioning of Nuclear Power Plants and Research Reactors, Safety Guide, SS № WS-G-2.1 (1999) The Decommissioning of WWER-Type Nuclear Power Plants, IAEA-TECDOC-1133 (2000) Record keeping for the Decommissioning of Nuclear Facilities: Guidelines and Experience, TRS № 411(2002) Regulation for the Safety of the Decommissioning of Nuclear Facilities, 2004
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.