Download presentation
Presentation is loading. Please wait.
Published byGrace Daniel Modified over 9 years ago
1
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings 12 th floor lounge Furniture replacement Microfridge purchase
2
Floor Elevator Atrium Area Before After
3
Hallway BeforeAfter
4
Student Room Doors Before After
5
Student Room Walls AfterBefore
6
Bathroom AfterBefore
7
Room Desks Old Built-in Desks & DressersNew Desks & Bookshelves
8
Beds and Dressers New Bed and DresserOld Bed
9
Amenities Old Refrigerator New Microfridge
10
Students Make TWU Home
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.