Download presentation
Presentation is loading. Please wait.
Published byLawrence Haynes Modified over 9 years ago
1
1 PPS Demonstrations August 28, 2007
2
2 Agenda PPS Architecture Overview (15 minutes) – Tony Krueger ETC Overview and Demo (30 minutes) – Donald Mclean APT Overview and Demo (45 minutes) – Tom Donaldson Break (15 minutes) GMS Presentation (45 minutes) – Maria Bertch
3
3 PPS Architecture Overview
4
4 APT/ETC History Both started as a Goddard prototype called the Scientist’s Expert Assistant (SEA). STScI provided science direction Goddard & Goddard contractor’s built the prototype 1998 to 2001 (approximate timeframe) HST takes SEA & builds upon the concept APT/ETC released in 2002 (cycle 12) for operational use Over the years, we replaced many portions of the original code & brought the code up to production standards. Code from the original prototype is still used operationally today ETC used by HST, & will be adapted for JWST APT used by HST, SOFIA, & will be adapted for JWST
5
5 HST ETC Trade Study In the fall of 2006, we carried out a study of how we would implement ETCs for JWST (JWST-STScI-000912) Concluded that the HST architecture for ETCs are usable for JWST Defined a general set of algorithms for use in sensitivity calculations Assessed how background effects would be incorporated into these calculations
6
6 HST APT Trade Study In the fall of 2005, we carried out a study of how we would implement the Proposal Definition Tool for JWST ( JWST-STScI-000518 ) We compared APT to Spitzer’s Tool (Spot) We worked with Spitzer’s Team Lead (Trey Roby) to do a functional comparison Both tools were very similar in features APT had a few more capabilities and we felt that it would be less cost to modify
7
7 PPS Process Flow Overview Peer Review Of Science Proposals (~1400) Grant Process Begins STScI Director Review & Approval Preparing Science Proposal for Science Review PI Gets Time on the Observatory YEAH! PI uses ETC To Prepare Observations For Flight PI uses APT To Prepare Science Proposal APT used to Develop Sci/Cal/Eng Program GO Proposals Cycle Boundary DD Proposals Anytime Long Range Planning Short Term Scheduling Planning & Scheduling the Observations STScI Staff GO/Calib/Eng Programs GO Programs Programs Change During the Cycle PI uses ETC To Determine Amount of Time Needed
8
8 Exposure Time Calculators Donald Mclean
9
9 What is an ETC Software modeling of an instrument Purpose Estimate feasibility for observations Estimate how much time needed to obtain desired science Refine observation settings in proposals Web application Easy to Use Available all the time Observers don’t have to install software
10
10 ETC Servers Architecture Drivers Reliability & fast response times 3 servers with round-robin fail over scheme 1 goes down, two others available…. Compute power needed to support load @ submission deadlines Needed to ensure that ETCs are available and responsive at submission deadlines JWST ETCs NIRCAM Imaging NIRCAM Coronagraphic NIRSPEC Spectroscopic NIRSPEC Acquisition NIRSPEC Target Acquisition Simulator MIRI Imaging MIRI Spectroscopic MIRI Acquisition MIRI Coronagraphic FGS-Guider FGS-TFI Imaging FGS-FTI Coronagraphic Calculation request Calculation response Linux ETC Server Proxy Server Running @ STScI
11
11 ETC Architecture Synthetic Photometry Package ETC Calculation Engine ETC Data Storage Instrument Configuration Properties Web Servlets Spectrum Library Calculation request Calculation response Log request Retrieve calculation results Initiate calculation Data Replication Module Other ETC Servers Each Linux ETC Server runs the following Runs within Apache/Tomcat Runs on Server Outside Apache/Tomcat KEY
12
12 ETC Functionalities Estimate Signal-to-Noise Ratio (SNR)/Time Evaluate detector specific count and rate limits (non- linearity, health and safety, etc.) Provide detailed count estimates With ETC documentation and a copy of Synthetic Photometry Package, user should be able to duplicate ETC calculations Plots Instrument throughput Source light curve Spectroscopic counts/integrated pixel as a function of wavelength by type
13
13 Exposure Time Calculators Demo
14
14 ETC Modification for JWST Create input pages Instrument configuration options Wavelength range appropriate spectra Point spread functions Relevant background properties Create acceptance and regression tests Synthetic photometry support Instrument component throughputs Map instrument settings to components Component thermal emission properties
15
15 ETC Modification for JWST Instrument configuration validation Observatory Constrain Manager (from APT) ETC Data Instrument configuration components and settings Calculation parameters (dark current, read noise, etc.) Point spread function (PSF) data Sky Background Simulation Formatting of output to meet needs of instrument users
16
16 PPS Process Flow Overview Peer Review Of Science Proposals (~1400) Grant Process Begins STScI Director Review & Approval Preparing Science Proposal for Science Review PI Gets Time on the Observatory YEAH! PI uses ETC To Prepare Observations For Flight PI uses APT To Prepare Science Proposal APT used to Develop Sci/Cal/Eng Program GO Proposals Cycle Boundary DD Proposals Anytime Long Range Planning Short Term Scheduling Planning & Scheduling the Observations STScI Staff GO/Calib/Eng Programs GO Programs Programs Change During the Cycle PI uses ETC To Determine Amount of Time Needed
17
17 Astronomer’s Proposal Tool Tom Donaldson
18
18 Uses of APT PIs use APT to prepare HST proposals for review and implementation. STScI scientists and engineers use APT to prepare calibration & engineering programs for HST. STScI operations staff use APT to help validate and maintain programs. PIs use APT to prepare proposals for the SOFIA Observatory.
19
19 APT is supported on Linux, Mac, Windows and Solaris. Observatory-Independent Core APT Architecture Document Browser Form Editor Spreadsheet Plug-In Support Document Models Tools
20
20 Astronomer’s Proposal Tool Demo
21
21 APT Modification for JWST JWST Data Model updates to support JWST science/calibration/engineering programs Extensions to GUI to support JWST science/calibration/engineering programs MSA Observation Tool Guide Star Interface Overhead Analysis Visit Planner Server ETC Plug-In Infrastructure Enhancements
22
22 15 Minute Break
23
23 PPS Process Flow Overview Peer Review Of Science Proposals (~1400) Grant Process Begins STScI Director Review & Approval Preparing Science Proposal for Science Review PI Gets Time on the Observatory YEAH! PI uses ETC To Prepare Observations For Flight PI uses APT To Prepare Science Proposal APT used to Develop Sci/Cal/Eng Program GO Proposals Cycle Boundary DD Proposals Anytime Long Range Planning Short Term Scheduling Planning & Scheduling the Observations STScI Staff GO/Calib/Eng Programs GO Programs Programs Change During the Cycle PI uses ETC To Determine Amount of Time Needed
24
24 Grants Management System Maria Bertch
25
25 Programs & Grants Accepted Science Program 1 For each science program there is a budget For each budget there can be 1 or more grants 1 investigator per grant (US investigators only) Each investigator submits & manages their own grant Accepted Science Program N STScI Grants Office Manages Thousands of Grants
26
26 Grant Administration PI Submits Budget Peer Review of Budget Grant Awarded PI Gets Time on the Observatory YEAH! Grant Closeouts STScI Requests Budget Grant Process (cradle to grave) STScI Notifies PI about their Funding STScI Director Review & Approval Grant Reporting & Mods Distribute Funds Budget Preparation & Review Process Investigator moves to new Institution Grant Management Process
27
27 STGMS Functionalities STGMS is made up of two main software applications. STGMS – External System Used by institutions and investigators to submit budgets, monitor their grants, submit reports and process other grant requests, etc. STGMS – Internal System Used by the STScI Grants Administration staff to process grant actions, monitor grants and prepare for financial review of requested budgets. It is also used by Accounting staff to process payment requests from grantees.
28
28 STGMS Architecture External system used by investigators and administrators Internal system used by STScI One system linked by web services and database Two Parts of the Same System (Sybase)
29
29 Grant Administration PI Submits Budget Peer Review of Budget Grant Awarded PI Gets Time on the Observatory YEAH! Grant Closeouts STScI Requests Budget Grant Process (cradle to grave) STScI Notifies PI about their Funding STScI Director Review & Approval Grant Reporting & Mods Distribute Funds Budget Preparation & Review Process Investigator moves to new Institution Grant Management Process
30
30 PI Prepares Budget for Submission to STScI
31
31 Tool Help – Budget Screen
32
32 PI Reviews Budget Before Submission (PDF)
33
33 Grant Administration PI Submits Budget Peer Review of Budget Grant Awarded PI Gets Time on the Observatory YEAH! Grant Closeouts STScI Requests Budget Grant Process (cradle to grave) STScI Notifies PI about their Funding STScI Director Review & Approval Grant Reporting & Mods Distribute Funds Budget Preparation & Review Process Investigator moves to new Institution Grant Management Process
34
34 PI Funding Notification Letter sent from STScI
35
35 Grant Administration PI Submits Budget Peer Review of Budget Grant Awarded PI Gets Time on the Observatory YEAH! Grant Closeouts STScI Requests Budget Grant Process (cradle to grave) STScI Notifies PI about their Funding STScI Director Review & Approval Grant Reporting & Mods Distribute Funds Budget Preparation & Review Process Investigator moves to new Institution Grant Management Process
36
36 PI Grant Modification Example - No Cost Extension Request
37
37 STScI Reviews No Cost Extension Request
38
38 STScI Reviews Grant Details
39
39 STScI notifies PI that their Grant has been Amended
40
40 Grant Administration PI Submits Budget Peer Review of Budget Grant Awarded PI Gets Time on the Observatory YEAH! Grant Closeouts STScI Requests Budget Grant Process (cradle to grave) STScI Notifies PI about their Funding STScI Director Review & Approval Grant Reporting & Mods Distribute Funds Budget Preparation & Review Process Investigator moves to new Institution Grant Management Process
41
41 STScI Grant Management
42
42 STScI Report Generation
43
43 Example Report
44
44 STScI Reviews Grant Details
45
45 Example Report
46
46 GMS Statistics Number of grants in GMS (since 5/1/00): 6439 Number of active grants: 2023 Number of institutions that can receive grants: 403 Number of institutions with awarded grants: 341 It takes ~50 transactions to process a grant from inception to closeout (i.e. create and pre-populate grant, budget submission, award process, reports, documents, special requests, check issuance, etc) ~ 321,905 transactions handled by the Grants Office since 5/1/00
47
47 GMS Interface to PPS DB JWST PPS Database (SQL Server) (Sybase) Program Data & Execution Status GMS Nightly Extraction of Program Data & Execution Status
48
48 GMS Modification for JWST GMS needs data from the JWST PPS database. Data extracted (investigator information, time allocation, status of observations…) This process is run nightly to keep existing grants up to date and to create new grants as new science are awarded. Code to modify grants based on program status (executed, failed, withdrawn) JWST PPS data will be from SQL Server DB not Sybase DB Updates to the External System to allow investigators and administrators to select their JWST grants
49
49 GMS Modification for JWST (con’t) Changes to track JWST time vs. HST orbits. Reporting changes Database changes Develop reports needed specifically for JWST Create user help for JWST GMS Create regression tests for JWST
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.