5 Design of Goods and Services Heizer and Render

Similar presentations


Presentation on theme: "5 Design of Goods and Services Heizer and Render"— Presentation transcript:

1 5 Design of Goods and Services Heizer and Render
Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl

2 Regal Marine Global market 3-dimensional CAD system
Reduced product development time Reduced problems with tooling Reduced problems in production Assembly line production JIT

3 Product Decision The objective of the product decision is to develop and implement a product strategy that meets the demands of the marketplace with a competitive advantage

4 Product Decision The good or service the organization provides society
Top organizations typically focus on core products Customers buy satisfaction, not just a physical good or particular service Fundamental to an organization's strategy with implications throughout the operations function

5 Product Strategy Options
Differentiation Shouldice Hospital Low cost Taco Bell Rapid response Toyota

6 Product Life Cycles May be any length from a few hours to decades
The operations function must be able to introduce new products successfully

7 Product Life Cycle Introductory Phase Growth Phase
Fine tuning may warrant unusual expenses for Research Product development Process modification and enhancement Supplier development Growth Phase Product design begins to stabilize Effective forecasting of capacity becomes necessary Adding or enhancing capacity may be necessary

8 Product Life Cycle Maturity Phase Decline Phase
Competitors now established High volume, innovative production may be needed Improved cost control, reduction in options, paring down of product line Decline Phase Unless product makes a special contribution to the organization, must plan to terminate offering

9 Product Life Cycle Costs
Concept Detailed Manufacturing Distribution, design design service, prototype and disposal Percent of total cost 100 – 80 – 60 – 40 – 20 – 0 – Costs committed Costs incurred Ease of change

10 Product-by-Value Analysis
Lists products in descending order of their individual dollar contribution to the firm Lists the total annual dollar contribution of the product Helps management evaluate alternative strategies

11 New Product Opportunities
Understanding the customer Economic change Sociological and demographic change Technological change Political/legal change Market practice, professional standards, suppliers, distributors Brainstorming is a useful tool

12 Disney Attendance

13 Product Development System

14 Quality Function Deployment
Identify customer wants Identify how the good/service will satisfy customer wants Relate customer wants to product hows Identify relationships between the firm’s hows Develop importance ratings Evaluate competing products Compare performance to desirable technical attributes

15 Competitive assessment
QFD House of Quality How to satisfy customer wants Interrelationships What the customer wants Customer importance ratings Competitive assessment Relationship matrix Weighted rating Technical evaluation Target values

16 House of Quality Example
Your team has been charged with designing a new camera for Great Cameras, Inc. The first action is to construct a House of Quality

17 House of Quality Example
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors What the customer wants Customer importance rating (5 = highest) Lightweight 3 Easy to use 4 Reliable 5 Easy to hold steady 2 Color correction 1

18 House of Quality Example
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors Low electricity requirements Aluminum components Ergonomic design Auto exposure Auto focus Paint pallet How to Satisfy Customer Wants

19 House of Quality Example
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors High relationship Medium relationship Low relationship Lightweight 3 Easy to use 4 Reliable 5 Easy to hold steady 2 Color corrections 1 Relationship matrix

20 House of Quality

21 House of Quality Lightweight 3 Easy to use 4 Reliable 5
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors Lightweight 3 Easy to use 4 Reliable 5 Easy to hold steady 2 Color corrections 1 Our importance ratings Weighted rating

22 Our importance ratings 22 5
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors Company A Company B G P F G P P Lightweight 3 Easy to use 4 Reliable 5 Easy to hold steady 2 Color corrections 1 Our importance ratings 22 5 How well do competing products meet customer wants

23 (Technical attributes)
What the Customer Wants Relationship Matrix Technical Attributes and Evaluation How to Satisfy Customer Wants Interrelationships Analysis of Competitors Target values (Technical attributes) Technical evaluation Company A % yes 1 ok G Company B % yes 2 ok F Us % yes 2 ok G Failure 1 per 10,000 Panel ranking 2 circuits 2’ to ∞ 0.5 A 75%

24 Completed House of Quality
Lightweight 3 Easy to use 4 Reliable 5 Easy to hold steady 2 Color correction 1 Our importance ratings Low electricity requirements Aluminum components Ergonomic design Auto exposure Auto focus Paint pallet Company A Company B G P F G P P Target values (Technical attributes) Technical evaluation Company A % yes 1 ok G Company B % yes 2 ok F Us % yes 2 ok G Failure 1 per 10,000 Panel ranking 2 circuits 2’ to ∞ 0.5 A 75% Completed House of Quality

25 House of Quality Sequence
Deploying resources through the organization in response to customer requirements Production process Quality plan House 4 Specific components Production process House 3 Design characteristics Specific components House 2 Customer requirements Design characteristics House 1 Figure 5.4

26 Organizing for Product Development
Historically – distinct departments Duties and responsibilities are defined Difficult to foster forward thinking A Champion Product manager drives the product through the product development system and related organizations Team approach Cross functional – representatives from all disciplines or functions Product development teams, design for manufacturability teams, value engineering teams Japanese “whole organization” approach No organizational divisions

27 Manufacturability and Value Engineering
Benefits: Reduced complexity of products Reduction of environmental impact Additional standardization of products Improved functional aspects of product Improved job design and job safety Improved maintainability (serviceability) of the product Robust design

28 Issues for Product Development
Robust design Modular design Computer-aided design (CAD) Computer-aided manufacturing (CAM) Virtual reality technology Value analysis Environmentally friendly design

29 Issues for Product Development Robust Design
Product is designed so that small variations in production or assembly do not adversely affect the product Typically results in lower cost and higher quality Modular Design Products designed in easily segmented components Adds flexibility to both production and marketing Improved ability to satisfy customer requirements

30 Issues for Product Development Computer Aided Design (CAD)
Using computers to design products and prepare engineering documentation Shorter development cycles, improved accuracy, lower cost Information and designs can be deployed worldwide

31 Issues for Product Development Extensions of CAD
Design for Manufacturing and Assembly (DFMA) Solve manufacturing problems during the design stage 3-D Object Modeling Small prototype development CAD through the internet International data exchange through STEP

32 Computer-Aided Manufacturing (CAM)
Utilizing specialized computers and program to control manufacturing equipment Often driven by the CAD system (CAD/CAM) Benefits of CAD/CAM Product quality Shorter design time Production cost reductions Database availability New range of capabilities

33 Issues for Product Development Virtual Reality Technology
Computer technology used to develop an interactive, 3-D model of a product from the basic CAD data Allows people to ‘see’ the finished design before a physical model is built Very effective in large-scale designs such as plant layout Value Analysis Focuses on design improvement during production Seeks improvements leading either to a better product or a product which can be produced more economically with less environmental impact

34 Ethics, Environmentally Friendly Designs, and Sustainability
It is possible to enhance productivity and deliver goods and services in an environmentally and ethically responsible manner In OM, sustainability means ecological stability Conservation and renewal of resources through the entire product life cycle

35 Ethics, Environmentally Friendly Designs, and Sustainability
Polyester film and shoes Production Prevention in production and packaging Destruction Recycling in automobiles

36 The Ethical Approach View product design from a systems perspective
Inputs, processes, outputs Costs to the firm/costs to society Consider the entire life cycle of the product

37 The Ethical Approach Goals
Developing safe end environmentally sound practices Minimizing waste of resources Reducing environmental liabilities Increasing cost-effectiveness of complying with environmental regulations Begin recognized as a good corporate citizen

38 Guidelines for Environmentally Friendly Designs
Make products recyclable Use recycled materials Use less harmful ingredients Use lighter components Use less energy Use less material

39 Laws and Industry Standards
For Design … Food and Drug Administration Consumer Products Safety Commission National Highway Safety Administration Children’s Product Safety Act Occupational Safety and Health Administration Environmental Protection Agency Professional ergonomic standards State and local laws dealing with employment standards, discrimination, etc. Vehicle Recycling Partnership Increasingly rigid laws worldwide For Manufacture/Assembly … For Disassembly/Disposal …

40 Time-Based Competition
Product life cycles are becoming shorter and the rate of technological change is increasing Developing new products faster can result in a competitive advantage

41 Product Development Continuum

42 Acquiring Technology By Purchasing a Firm Through Joint Ventures
Speeds development Issues concern the fit between the acquired organization and product and the host Through Joint Ventures Both organizations learn Risks are shared Through Alliances Cooperative agreements between independent organizations

43 Defining A Product First definition is in terms of functions
Rigorous specifications are developed during the design phase Manufactured products will have an engineering drawing Bill of material (BOM) lists the components of a product

44 Defining A Product: Product Documents
Engineering drawing Shows dimensions, tolerances, and materials Shows codes for Group Technology Bill of Material Lists components, quantities and where used Shows product structure

45 Engineering Drawings Figure 5.8

46 Bills of Material Hard Rock Cafe’s Hickory BBQ Bacon Cheeseburger
DESCRIPTION QTY Bun 1 Hamburger patty 8 oz. Cheddar cheese 2 slices Bacon 2 strips BBQ onions 1/2 cup Hickory BBQ sauce 1 oz. Burger set Lettuce 1 leaf Tomato 1 slice Red onion 4 rings Pickle 1 slice French fries 5 oz. Seasoned salt 1 tsp. 11-inch plate 1 HRC flag 1 Hard Rock Cafe’s Hickory BBQ Bacon Cheeseburger Figure 5.9 (b)

47 Group Technology Parts grouped into families with similar characteristics Coding system describes processing and physical characteristics Part families can be produced in dedicated manufacturing cells

48 Group Technology Benefits
Improved design Reduced raw material and purchases Simplified production planning and control Improved layout, routing, and machine loading Reduced tooling setup time, work-in-process, and production time

49 Documents for Production
Assembly drawing Assembly chart Route sheet Work order Engineering change notices (ECNs)

50 Documents: Assembly Drawing
Shows exploded view of product Details relative locations to show how to assemble the product Figure 5.11 (a)

51 Documents: Assembly Chart
1 2 3 4 5 6 7 8 9 10 11 R 209 Angle R 207 Angle Bolts w/nuts (2) Bolt w/nut R 404 Roller Lock washer Part number tag Box w/packing material SA 1 SA 2 A1 A2 A3 A4 A5 Left bracket assembly Right bracket Poka-yoke inspection Identifies the point of production where components flow into subassemblies and ultimately into the final product Figure 5.11 (b)

52 Documents: Route Sheet
Lists the operations and times required to produce a component Setup Operation Process Machine Operations Time Time/Unit 1 Auto Insert 2 Insert Component Set 56 2 Manual Insert Component Insert 1 Set 12C 3 Wave Solder Solder all components to board 4 Test 4 Circuit integrity test 4GY

53 Documents: Work Order Instructions to produce a given quantity of a particular item, usually to a schedule Work Order Item Quantity Start Date Due Date Production Delivery Dept Location 157C 125 5/2/08 5/4/08 F32 Dept K11

54 Documents: Engineering Change Notice (ECN)
A correction or modification to a product’s definition or documentation Engineering drawings Bill of material Quite common with long product life cycles, long manufacturing lead times, or rapidly changing technologies

55 Documents: Configuration Management
The need to manage ECNs has led to the development of configuration management systems A product’s planned and changing components are accurately identified and control and accountability for change are identified and maintained

56 Product Life-Cycle Management (PLM)
Integrated software that brings together most, if not all, elements of product design and manufacture Product design CAD/CAM, DFMA Product routing Materials Assembly Environmental

57 Service Design Service typically includes direct interaction with the customer Increased opportunity for customization Reduced productivity Cost and quality are still determined at the design stage Delay customization Modularization Reduce customer interaction, often through automation

58 Moments of Truth Concept created by Jan Carlzon of Scandinavian Airways Critical moments between the customer and the organization that determine customer satisfaction There may be many of these moments These are opportunities to gain or lose business

59 Moments-of-Truth Computer Company Hotline
The technician was sincerely concerned and apologetic about my problem He asked intelligent questions that allowed me to feel confident in his abilities The technician offered various times to have work done to suit my schedule Ways to avoid future problems were suggested Experience Enhancers Best Only one local number needs to be dialed I never get a busy signal I get a human being to answer my call quickly and he or she is pleasant and responsive to my problem A timely resolution to my problem is offered The technician is able to explain to me what I can expect to happen next Standard Expectations Better I had to call more than once to get through A recording spoke to me rather than a person While on hold, I get silence, and wonder if I am disconnected The technician sounded like he was reading a form of routine questions The technician sounded uninterested I felt the technician rushed me Experience Detractors Figure 5.13

60 Documents for Services
High levels of customer interaction necessitates different documentation Often explicit job instructions for moments-of-truth Scripts and storyboards are other techniques

61 First Bank Corp. Drive-up Teller Service Guidelines
Be especially discreet when talking to the customer through the microphone. Provide written instructions for customers who must fill out forms you provide. Mark lines to be completed or attach a note with instructions. Always say “please” and “thank you” when speaking through the microphone. Establish eye contact with the customer if the distance allows it. If a transaction requires that the customer park the car and come into the lobby, apologize for the inconvenience.

62 Application of Decision Trees to Product Design
Particularly useful when there are a series of decisions and outcomes which lead to other decisions and outcomes

63 Application of Decision Trees to Product Design
Procedures Include all possible alternatives and states of nature - including “doing nothing” Enter payoffs at end of branch Determine the expected value of each branch and “prune” the tree to find the alternative with the best expected value

64 Hire and train engineers
Decision Tree Example (.4) High sales Purchase CAD (.6) Low sales Hire and train engineers (.4) High sales (.6) Low sales Do nothing Figure 5.14

65 Hire and train engineers
Decision Tree Example (.4) High sales $2,500,000 Revenue - 1,000,000 Mfg cost ($40 x 25,000) - 500,000 CAD cost $1,000,000 Net Purchase CAD (.6) Low sales $800,000 Revenue - 320,000 Mfg cost ($40 x 8,000) - 500,000 CAD cost - $20,000 Net loss (.6) Low sales (.4) High sales Hire and train engineers Do nothing EMV (purchase CAD system) = (.4)($1,000,000) + (.6)(- $20,000) Figure 5.14

66 Hire and train engineers
Decision Tree Example (.4) High sales $2,500,000 Revenue - 1,000,000 Mfg cost ($40 x 25,000) - 500,000 CAD cost $1,000,000 Net Purchase CAD $388,000 (.6) Low sales $800,000 Revenue - 320,000 Mfg cost ($40 x 8,000) - 500,000 CAD cost - $20,000 Net loss (.6) Low sales (.4) High sales Hire and train engineers Do nothing EMV (purchase CAD system) = (.4)($1,000,000) + (.6)(- $20,000) = $388,000 Figure 5.14

67 Hire and train engineers
Decision Tree Example (.4) High sales $2,500,000 Revenue - 1,000,000 Mfg cost ($40 x 25,000) - 500,000 CAD cost $1,000,000 Net Purchase CAD $388,000 (.6) Low sales $800,000 Revenue - 320,000 Mfg cost ($40 x 8,000) - 500,000 CAD cost - $20,000 Net loss Hire and train engineers $365,000 (.4) High sales $2,500,000 Revenue - 1,250,000 Mfg cost ($50 x 25,000) - 375,000 Hire and train cost $875,000 Net (.6) Low sales $800,000 Revenue - 400,000 Mfg cost ($50 x 8,000) - 375,000 Hire and train cost $25,000 Net Do nothing $0 $0 Net Figure 5.14

68 Transition to Production
Know when to move to production Product development can be viewed as evolutionary and never complete Product must move from design to production in a timely manner Most products have a trial production period to insure producibility Develop tooling, quality control, training Ensures successful production

69 Transition to Production
Responsibility must also transition as the product moves through its life cycle Line management takes over from design Three common approaches to managing transition Project managers Product development teams Integrate product development and manufacturing organizations


Download ppt "5 Design of Goods and Services Heizer and Render"