LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, 2001 7 th LHCb Software Week.

Similar presentations


Presentation on theme: "LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, 2001 7 th LHCb Software Week."— Presentation transcript:

1 LHC Computing Review Recommendations http://lhc-computing-review-public.web.cern.ch John Harvey CERN/EP March 28 th, 2001 7 th LHCb Software Week

2 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 2 Major conclusions and recommendations 1 mScale of resource requirements assessed and accepted mMulti-tier hierarchical model + Grid endorsed  Expected ~1/3 at CERN mNeed affordable research network @ 1.5 Gbps for each experiment by 2006 mJoint software efforts encouraged between experiments and IT mData challenges encouraged to test infrastructure and software mAreas of concern in software (support of simulation & analysis) mMissing manpower for Core Software teams, CERN/IT

3 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 3 Major conclusions and recommendations 2 mTotal hardware costs (240 MCHF, LHCb ~27 MCHF i.e. ~11%)  Investment spread over ’05, ’06, ’07 in approx. equal portions  M&O – rolling replacement every 3 years mJoint prototype reaching ~50% of 1 facility for ’03/’04 mLHC Software & Computing Steering Committee (SC2)+TAGs to oversee deployment of entire computing structure mMoU describing funding of and responsibility for hardware and software mInterim MoU to be signed prior to MoU (software, prototype)

4 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 4 Multi-Tier Hierarchical Model CERN Region I Region F Region UK Region D CERN Tier-0 Tier-1 (national) Institute Tier-2 (production) Institute Server Institute Server Institute Server Institute Server Tier-3 Desktop server Institute MAP..

5 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 5 Rates and Installed Capacities ALICEATLASCMSLHCbTotal Event size (MB)25210.125 Raw data/year (PB)2.78.11.70.2513.0 MC data/year (PB)0.21.51.20.363.3 Tape at CERN (TB)32008959154091214611 Disk at CERN (TB)53441011433302417 CPU at CERN (kSI95)8246908202252559 Tape worldwide (TB)47001980010500280037900 Disk worldwide (TB)160025705900110011070 CPU worldwide (kSI95)1758194429079257535 WAN Tier0/Tier1 (Mb)1500 3104810

6 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 6 Manpower (FTEs) for CORE Software 2000 Have (miss) 20012002200320042005 ALICE12(5)17.516.51717.516.5 ATLAS23(8)3635302829 CMS15(10)273133 LHCb14(5)2524232221 Total64(28)105.5106.5103100.599.5 CERN/IT - current staff complement 187 - minimum required to run centre 157 - predicted complement in 2006 137 Only computing professionals counted

7 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 7 Hardware costs of CERN Computing ’05-’07 Units kCHFALICEATLASCMSLHCb CPU1106910667126673479 Disk2188190753141535 Robotic Tape320094071617958 Shelf Tape001816214 Total Cost1807323692231357040 Costs spread over ’05 (30%) ’06 (30%) ’07 (40%) LHCb Tier-1’s 20152 kSFr (74%)

8 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 8 Joint Prototype mUse testbed to test at realistic scales:  Fabric management  Data Challenges with realistic rates  Scalability tests of CPU and I/O performance  New technologies - Copper gigabit; New tapes, IA-64  Data Grid functionality mLHCb Data Challenges  July '02 : Functional OO software  July '02 : DC 1 - 10 6 events in ~2 weeks  Dec '02 : Computing TDR  July '03 : DC 2 - 10 7 events in ~2 weeks (DataGrid milestone)  Dec '04 : Software Production Readiness Review  July '05 : DC3 - 10 7 events (full test of software & infrastructure)

9 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 9 CERN Testbed Plans 15060 40WAN links (Mbps) 10.5 0.25Tape I/O rate (GB/s) 5015 5 Disk I/O rate (GB/s) 1.00.4 0.2Tape capacity (PB) 18055 16Disk capacity (TB) 1’200500 (April 140) 200  300 Number of systems (dual CPU systems) 4Q. 024Q. 014Q. 00

10 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 10 Observations and conclusions mWaiting for response from CERN management  guidelines on construction and cost sharing of prototype  timescale for Computing TDR and MoU  allocation of additional new effort to IT and experiments  role and composition of SC2 and timescale for launch Data management project already in preparation mCommunication with funding agencies  Discussions at LHCC, RRBs - preparation of IMoU  Responsibilities for core software (sharing policy)  Advance notice of long term computing plan (cost sharing)  Policy of access to centres outside CERN mPreparation of distributed computing infrastructure  Development of analysis model – physics use-cases  Development of grid services – integration in GAUDI  Preparation of data challenges

11 LHC Computing Review Recommendations J. Harvey 7 th LHCb Software Week 28 March 2001 Slide 11 Projects mEvent Filter Farm (Computing)  Control and management of farm, installation, scalability  specialisation of GAUDI to filter farm environment mSoftware Framework (GAUDI)  Event model – development and optimisation  Detector description – development and optimisation of geometry  Scripting component to allow interactive analysis based on PYTHON  Grid services  Data management (event data, conditions data, bookkeeping) mPhysics frameworks  Simulation framework using GEANT4 – coordination  Analysis framework – coordination  High level trigger framework – coordination mTools/utilities  software and data quality monitoring  Documentation, workbooks m….


Download ppt "LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, 2001 7 th LHCb Software Week."

Similar presentations


Ads by Google