Presentation is loading. Please wait.

Presentation is loading. Please wait.

M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad.

Similar presentations


Presentation on theme: "M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad."— Presentation transcript:

1 M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad.

2 1.KHAMMAM 8. KURNOOL 2.KRISHNA 9. ANANTAPUR 3. GUNTUR. 10 WEST GODAVARI 4. PRAKASHAM 11. EAST GODAVARI 5. NELLORE12. VISHAKAPTNAM 6. CHITTOOR13. VIZIANAGARAM. 7.KADAPA14. SRIKAULAM

3 1.HYDERABAD. 2.MEDAK. 3.MAHABOOBNAGAR 4.WARANGAL 5.NALGONDA 6.KARIMNAGAR. 7.NIZAMABAD. 8.ADILALABAD. 9. RANAGAREDDY

4 1. Construction of Admin. Building at ONGOLE (Balance work) Present Status : Decision is awaited from Corporate Office New Delhi for Construction of Balance work.

5 CMTS TOWERS Phase- VII All the CMTS towers under Phase VII, except those which were dropped later on due to non availability of site, site disputes and public objection are completed except 7 Towers which are in progress. Sl.NoNo of Sites allotted 2014-15 CompletedWIPYTS/Under Planning 1(142-78*)=64 5077

6 External Works on hand in AP CIVIL ZONE Sl. No Name of the workClient Organizatio n Cost of the Project Status of the work Expected Revenue 1 PMC for Construction of Shore based Laboratory building and Training Annexes for NIO Regional Centre at VISAKHAPATNAM National Institute of Oceanography Rs 20 croresPlanning stage 90.00 lakhs 2 Architectural and Engineering Consultancy Services for Construction of New Office Building Of Guntur Municipal Corporation, Guntur, Andhra Pradesh Municipal Corporation Guntur Rs 5.10 croresArchitectura l drawings are to be approved 9.35 lakhs 3 PMC for Construction of Regional Office and Br. Office AP Grameena Vikas Bank at KHAMMAM Andhra Pradesh Grameena Vikas Bank Rs 16.00 croresWork in progress ( 25% completed) 96.09 lakhs

7 External Works on hand in HYDERABAD Sl.N o Name of the workClient OrganizationCost of the Project (In Lakhs) Status of the work Expected Revenue 1Consultancy work on Construction of Infrastructure works for IIT, Hyderabad IIT, Hyderabad6430080% work completed 610.85 lakhs 2 Construction Administrative Building and Hostel Blocks for MANUU at Hyderabad Maulana Azad National Urdu University Hyderabad 135090% work completed 66.15 lakhs 3PMC for Construction of Regional Office and Br. Office AP Grameena Vikas Bank at Sangareddy AP Grameena Vikas Bank 65225% work completed 39.12 lakhs 4DOT- RMC-DCDOT29.23Planning stage 2.63 lakhs

8 SPACE AUIDT CASES PROCESSED IN REVENUE REALIZATION BY OFFERING VACANT SPACE TO OTHER PSUs: PARTICIPATED IN BIDDING CALLED BY BHARATIYA MAHILA BANK AT VISHAKPATNAM BY OFFERING VACANT SPACE IN TE BUILDING AT DABA GARDENS IN VISHAKAPATNAM. PROCESSED THE CASE FOR PARTICIPATION IN BIDDING CALLED BY ORIENTAL INSURANCE CORPORATION BY OFFERING THE VACANT SPACE IN TE BUILDING AT TIRUPATHI.

9 DETAILS OF SPACE AUDIT SSA WISE Sl.NoSSA NameTotal No of Bldgs ( Numbers) Total Available Area (In Sq.m) Area occupied (In Sq m) Spare and unutilized Area ( In Sq m) 1Krishna4816759155021257 2Khammam1754945363131 3Guntur411490314085818 4Prakasham2761215564557 5Nellore39108129838974 6Kurnool441273412207527 7Kadapa31970774972210 8Chittoor1229872117870 9Anantapur381203374814544 10West Godavari6919826179091917 11East Godavari4519520155483972 12Vishakapatnam2613194107472447 13Vizianagaram2670346634670 14Sri Kakulam2366425994648

10 THANK YOU


Download ppt "M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad."

Similar presentations


Ads by Google