Presentation is loading. Please wait.

Presentation is loading. Please wait.

JANE POXON Business Development Manager British Gas.

Similar presentations


Presentation on theme: "JANE POXON Business Development Manager British Gas."— Presentation transcript:

1 JANE POXON Business Development Manager British Gas

2 THE PRODUCT This unique “Plug and Save” technology and production is supported and developed by World class companies. CE marked and accredited with all the necessary safety requirements

3 Engineers from Copenhagen have developed and designed the highly efficient turbine blades for Windsave

4

5 DOMESTIC APPLICATION OUTPUT OF 1KILOWATT ELECTRICITY FED DIRECTLY INTO THE CUSTOMERS INSTALLATION DOES NOT REQUIRE BATTERIES VIRTUALLY NO VIBRATION OR NOISE PROVIDES ADDITIONAL INCOME THROUGH “GREEN DIVIDENDS” GRANTS AVAILABLE TOWARDS INSTALLATION COSTS.

6 THE INSTALLATION

7 Plug ‘n’ Save USUALLY INSTALLED WITHIN HALF A DAY NO INTERNAL ADDITIONAL WIRING REQUIRED PLUG IN AND SAVE

8

9

10

11 New Planning Policy Statement 22 (PPS22): Renewable Energy Local Authorities requesting guidance General Permitted Development Order PLANNING

12 PER UNIT Maximum Generator Output (kilowatts/unit) 1 Average Wind speed (metres/second) 5.7 Average Output per Unit (kilowatt) 0.158 Annual Output per site (kilowatt hours) 1,384 Annual Savings on Electricity (£)103.80 Annual Dividend from ROCs (£) 63.06 TOTAL ANNUAL SAVINGS166.86 Climate Change Levy reduction (£) 59.51 (where applicable) CALCULATED SAVINGS

13 THE UNSEEN SAVING APPROX 30,000 LITRES OF POISONOUS CARBON DIOXIDE GAS

14 SALES AND AFTER SALES

15 SALES AND AFTER SALES PRODUCT PREDICTED LIFE CYCLE 10 YEARS PLUS STATUTORY GUARANTEE SCENARIOS. POSSIBLE EXTENDED WARRANTY COVER CARE PRODUCT SCENARIOS

16 ANY QUESTIONS


Download ppt "JANE POXON Business Development Manager British Gas."

Similar presentations


Ads by Google