Download presentation
Presentation is loading. Please wait.
Published byBernard Hampton Modified over 9 years ago
1
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of brief here] Briefed by: [insert briefer’s name here] [insert briefer’s organization code here] [insert briefer’s phone number here] [Insert briefer’s e-mail address here] Insert program logo in this area Distribution Statement
2
Program logo here 2 Key Stakeholders NameOrganization APM MDA DT Coordinator COMOPTEVFOR (OTD) COMOPTEVFOR (OTC) CNO (N912) CNO (N-sponsor) JITC DOT&E (if required) Others (as required) -PMW, SYSCOMS, Service
3
Program logo here 3 Purpose of Briefing
4
Program logo here 4 Briefing Outline
5
Program logo here 5 ADM Exit Criteria and Action Item Status R Required at this time, but not completed G Completed YIn progress & on schedule
6
Program logo here 6 Concept/Requirement
7
Program logo here 7 System Overview Component/System Description
8
Program logo here 8 System Overview Capability Enabler
9
Program logo here 9 Deployed/ Mobile Units BASE IMA FISC Pier Connections CLINIC TRNG CEN HQ TELEPORT/STEP Long Haul (DISN & Commercial ) TRAINING CENTER USN/USMC LOGISTIC BASE NAVAL AMPHIBIOUS BASE NOC BASE MC AIR STATION End-to-End Connectivity NMCI at the Pier Development Strategy End-to-End Capability
10
Program logo here 10 Program Overview Accomplishments/History
11
Program logo here 11 Program Overview Previous Guidance (if Required)
12
Program logo here 12 Acquisition Coordination Team (ACT) The following (Program Name) ACT members have been briefed on the program status and concur with the fielding of (Program Name).
13
Program logo here 13 Program Information and Documentation Status R Required at this time, but does not exist B Requires development or updating w/in 12 months O Required at this time and under development/update G Current, with all required approvals Y In approval cycle. Expected Date in Comments NR Not required. Rationale in Comments
14
Program logo here 14 [insert program name] Program Overview Chart DATE OF REPORT: MM/DD/YYYY PM / SponsorCostSchedulePerformance Programmatic Compliance Logistics Contract Execution Contact Info here Description: Program Start Date: MM / YY [Insert program description here] Joint or International: [Insert joint or International details] Key Performance Parameters KPPObjectiveThresholdDemo OP Avail.90.90.98 S/W Reliability 200 hrs 200 hrs 1000 hrs S/W Mean 5 sec 5 sec 3.2 sec xxxx x x x Acquisition Objectives Quantity650 IOC12 / 99 Target Price (unit)$Various $M (FY XX)$610.12 Contractor Data ContractorLitton DSD Value / Type$NA / GSA Start / CompleteAPR97 / APR03 ContractorXXX Value / Type$XX / XXX Start / CompleteXXX / XXX Cost Data ($ in M)* CostObjectiveThresholdCurrent Est. R&D 0 0 0 Proc 300.3 300.3 380 O&S 250.5 250.5 276.1 xxxx x x x * Values from last approved APB (IT) ACAT Level: MDA: Budget Source: Overall Volatility Contract Execution Ratings: G= CPI/SPI.95 or > Y= CPI/SPI.85 -.94 R = CPI/SPI <.85 OSD T&E Oversight: Y/N
15
Program logo here 15 Affordability by Increment Notes 1. FY05 includes 11 LRIP systems and 27 Increment II Upgrade Kits which are on CODE B hold pending FRP 2. Target Inventory Objective of 110 systems * Current procurement and install schedule includes 96 ships and 4 shore sites * Remaining 10 systems planned for FY09 not shown in table, Program direction expects INC III installation to begin and INC II to end in FY09
16
Program logo here 16 SPAWAR 01-6 Cost Risk * Confidence Index based on weighted averages
17
Program logo here 17 Cost as an Independent Variable (CAIV)
18
Program logo here 18 Analysis of Alternatives KPPALT 1ALT 2ALT 3ALT 4 KPP 1 KPP 2 KPP 3 KPP 4 LCC ($TYM) Then Year Millions $$$$
19
Program logo here 19 Source Documents: –Typical source documents that effect strategy are ICD/CDD/CPD, AoA, etc. Approach: Single Step or Evolutionary –Each increment requires a MS C and if development a MS B. These could be supported by one CDD containing all capabilities and multiple CPDs supporting each increment of useable capability. Each increment could use the same CDD (revalidated each time) for the MS B and would have a separate CPD for the MS C. This method supports Evolutionary acquisition, the preferred approach. See CJCSI 3170 for other Evolutionary approached Acquisition Strategy (Requirements and Approach)
20
Program logo here 20 Acquisition Strategy (Program Structure) Concept Decision Milestone A RFP Development Milestone B Contract Award Development Test/OA Milestone C/LRIP Decision Operational Test IOC FRP Decision FY03 FY04 FY05 FY06 FY07 FY08FY09FY10
21
Program logo here 21 Acquisition Strategy (Business Approach) Current Contracts New Procurement Actions Proposed [name of effort] Contract –Competitive or Sole Source (if sole source provide justification –Contract Type: –Estimated contract value: –Period of Performance: –Acquisition Objectives: –Estimated Contract Award: –Status of Acquisition Plan:
22
Program logo here 22 Contractor Name, Contract Number, Contract Type, Short Contract Title Contract EV Metrics and Performance Projections Y Solvency (Provide comments in notes page) PEO and Program Manager/PMS-XXX, Program Acronym, ACAT XX, Date Reported CPI: SPI:
23
Program logo here 23 CPARS/IPARS/Award Fee Matrix Contractor PM Name/Gov’t PM Name Date of Review: ddmmmyy
24
Program logo here 24 LOGISTICS SUPPORT (Compliance with DoD/SECNAV 5000 series and policy documents) Logistics RequirementCompliance Exception Notes Independent Logistics Assessment (ILA) GREEN/YELLOW/RED Rating? When completed? Navy Training System Plan (NTSP) NTSP completed? Sustainment Training in Place? YES/NO Diminishing Manufacturing Sources & Matl. Shortages (DMSMS) DMSMS Process/Tool used to ID Obsolescence challenges? YES/NO Unique Identification (UID) Policy implementation DFARS Clause 252.211-7003 in contract/contract mods? YES/NO Digital Product and Technical Data Manuals, Drawings, Illustrations available in approved digital formats? YES/NO Human Systems Integration (HSI) HSI factors addressed in AS, SEP, and NTSP? YES/NO Performance Based Logistics (PBL) implementation PBL strategy considered and decision documented in BCA? YES/NO
25
Program logo here 25 Program Assessment Installation Readiness Place the assessment rating icon here. Delete the remaining.
26
Program logo here 26 Software Maturity Software Trouble Reports (STRs) S/W Build Version x.xx # of STRs
27
Program logo here 27 Software Maturity Priority 1 STR’s
28
Program logo here 28 Software Maturity Priority 1 STR Status
29
Program logo here 29 [Combat capability] ThresholdObjective [C4I Interoperability, (Strategic, Theater, Force Coord.)] [Endurance] [Cost] [Manning] [Sustained Speed] KPP Compliance
30
Program logo here 30 NESI SUMMARY Technical Evaluation Summary CountScoring No Evaluation No Compliance (0) Low Compliance (1) Some Compliance (2) Complete Compliance (4) Waived Waived (Registered) 131Total Tests Evaluation Count Total Score 2.26Mean Score Best Possible Total Score Percent of Best Possible Score Acquisition Evaluation Summary CountScoring No Evaluation No Compliance (0) Low Compliance (1) Some Compliance (2) Complete Compliance (4) Waived Waived (Registered) 35Total Tests Evaluation Count Total Score 3.31Mean Score Best Possible Total Score Percent of Best Possible Score
31
Program logo here 31 NESI Status 0 1 2 3 4 Acquisition 01 2 3 4 Technical No Compliance Complete Compliance Some Compliance Low Compliance The “Mean Score” from each summary chart automatically creates the Maturity level.
32
Program logo here 32 COI Assessment (Based on DT Results)* COIRisk Effectiveness Capacity (example) Survivability (example) Joint Interoperability (Net Ready) Etc. Suitability Reliability Maintainability Operational Availability Logistic Supportability Compatibility Interoperability Training Human Factors Safety Documentation * For DRR, assess likelihood of achieving COI Thresholds
33
Program logo here 33 DT Recommendation
34
Program logo here 34 Developmental Testing & Evaluation (DT&E) Results ParameterThresholdObjectiveResult/Assessment KPP’s KPP 1 KPP 2 MOE’s/MOS’s MOE 1 MOE 2 MOS 1 MOS 2 CTP’s CTP 1 CTP 2
35
Program logo here 35 OT Scope of Test
36
Program logo here 36 T&E Exceptions Waivers Deferrals
37
Program logo here 37 Interoperability (Net Ready)
38
Program logo here 38 e LIKELIHOOD e d c b a CONSEQUENCE dc b a HighMedium LowMedium Risk Advisory Board: [Mr. X, PMA xxx] [Ms. Y, XYZ Corp] [Ms. Z, DASN YY] A brief description of Issue # 4 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 4 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 3 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 3 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 2 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 2 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 1 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 1 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 5 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 5 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 6 and rationale for its rating. Approach to remedy/mitigation A brief description of Issue # 6 and rationale for its rating. Approach to remedy/mitigation Acronyms: [IMA= Intermediate Maintenance Activity] Program Risk Assessment
39
Program logo here 39 Key Issues No further action required Significant interest outside Program Cannot be solved within the Program Legend IssueDue DateResponseStatus
40
Program logo here 40 Other Decision Factors and Challenges [List as appropriate] Example: Acquisition Coordination Team, Chaired by [insert name] concurred that [insert program name] is ready for OT&E on [date] Example: Acquisition Coordination Team, Chaired by [insert name] concurred that [insert program name] is ready to enter SDD Phase
41
Program logo here 41 PM Assessment
42
Program logo here 42 Recommendations
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.