Presentation is loading. Please wait.

Presentation is loading. Please wait.

We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical.

Similar presentations


Presentation on theme: "We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical."— Presentation transcript:

1 We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical Specialists) HQ (Data Reporting) HQ (Data Reporting) Field life cycle - Drilling, Completion, Production, Intervention A Permanent Infrastructure 2

2 We set the standard A Permanent Infrastructure Drilling

3 We set the standard A Permanent Infrastructure Drilling

4 We set the standard A Permanent Infrastructure Drilling

5 We set the standard IMEX – Integrated Media Exchange Platform 1 Platform 2 Operation Center 1 Operation Center 2 Company Offices IMEX System Building a knowledge community Full control of display walls setup and sources. Full control of any available video/audio source. Full CCTV interface and control. Send and receive desktops between members. Track online resources, share, view, collaborate. Set up HD Collaboration conferences. Regular video conference functions. Built in personal audio conference. Built in personal video conference. Streaming functions for web, documentation, playback. Drillers interface. … and much more Collect Integrate View Control Share Collect Integrate View Control Share Collect Integrate View Control Share Collect Integrate View Control Share IMEX tracks company wide expertise, knowledge, experience - enables online exchange of information between members. Internet

6 We set the standard

7 Discovery - Data Access Tool View data from any data source View data from any rig One page status view of all operations Single rig status view Drill down charts, queries, computations Analyze, annotate, search Queries Add, update, delete Import / Export Extensive reporting Print Copy/Paste Full WITSML 1.2 compatibility

8 We set the standard Global Topology – remote operations Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical Specialists) HQ (Data Reporting) HQ (Data Reporting) Field life cycle - Drilling, Completion, Production, Intervention

9 We set the standard The independent infrastructure allows… Integration and utilization of information across disciplines Reservoir Geology Logistics Drilling Well Training Simulation Production Facilities Maintenance Modification Crisis Safety Horizontal integration Vertical Integration Operation Centers / Facilities A Permanent Infrastructure Real Time Intelligence Remote Operations

10 We set the standard References BP OOC Valhall Stavanger (2) PPC Valhall Platform (1) PPC Ula Platform (1) SiteCom System ConocoPhillips ODC 1 Stavanger (3) ODC 2 Stavanger (2) OOC Stavanger (6) Eldfisk A (1) 2/4X RDC (1) 2/7B RDC (1) 2/4Q RDC (1) 2/4H POC (1) 2/4J POC (1) 2/4K POC (1) 2/7B POC (1) 2/4E POC (1) Well Service (1) ABB Maint/Mod (1) SiteCom System Statoil OSC HNO Stjørdal (11) Heidrun TLP Drilling (1) Heidrun TLP Production (1) Heidun Production Stjørdal (1) As of 05.05.04 Kristin Production Platform (1) Kristin Production Stjørdal (1) Åsgard A and B (2) Rotvoll 1 (1) Rotvoll 2 (1) Maersk Drilling Maersk Galant (1) Maersk Innovator (1) Odfjell Drilling Onshore Operations Support Bergen (1) Onshore Operations Suuport Stavanger (1) Deep Sea Delta RDC (2) Smedvig West Alpha SiteCom Saipem S.p.A Scarabeo 5 RDC (3) GlobalSantaFe Training Simulator (1) Hydro North Sea Business Case Grane 3D Visualization (1) Grane Production (2) Grane Sandsli Porduction (3) Oseberg East Production (1) Oseberg East Sandsli (2) Petoro North Sea Business Case Shell EPE Ormen Lange study Shell EPA Champion West business case GeoServices SiteCom Smith Bits SiteCom Sense Intellifield 24/7 SiteCom

11 We set the standard WITSML in Real Time Operations Install a ”permanent infrastructure” including operation centers, collaboration rooms, and data gathering, distribution and management system (WITSML). Put multi-discipline teams together for better decisions. Build a ”virtual organization” where data and media is available, everywhere utilizing WITSML and other collaboration tools. Able to easily choose or change Service Companies and Interpretation Tools as needed for each geographical area and project. Allows monitoring of Contract Compliance for specific WITSML data objects to be delivered Install real time QA/QC tools to qualify the data. Use the permanent infrastructure to store real time data Depth and Time Data. Fastest Access Time Let resources and expertise collaborate, on a global scale, company wide. Let the ”permanent infrastructure” be a catalyst to further optimize decisions, visualization, smart controls and analysis tools, control optimization.

12 We set the standard www.intellifield.no www.sensetech.no


Download ppt "We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical."

Similar presentations


Ads by Google