Energy Group Kilowatt Hour Meter Date: 11/14/2011 Project Update Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen, Jack Geiger, Aaron Gettamy, Jon Martin, Ryan Slater, and Zach Sorrell
2
Objective – Design and implement a reliable and manufacturable device to measure, display, and limit AC power usage by a home or another building. Energy sharing Energy awareness Energy conservation The Project Clients: SIM (Serving In Mission) Matt Walsh Commercial Market
3
Jan. 2004 – Site team installed solar array Mahadaga, Burkina Faso Handicapped Center Solar pump for Maternity Clinic Aug. 2007 – Request by Matt Walsh Sept. 2009 – Project started June 2010 – Nonfunctional prototype sent to Burkina January 2012 – Functional prototypes sent to Burkina History
4
4 sdfg Building hardware for KWHR Meter Version 1.2v2 Coding Software Testing Functionality Creating complete meter Current Work
5
Schedule - Milestones 11/14/11: Complete Enclosure/Wired boards 11/21/11: Completed electronic hardware testing of meter 11/28/11: Programming complete 12/12/11: System testing and 5 completed meters 1/2/12: Site team trip to Mahadaga, Burkina Faso
6
For our members to continue to have energy, passion, and time for the project. Finish building/testing prototype before January January site team trip SIM and Matt Walsh’s work in Mahadaga Burkina Faso. Prayer Requests