Download presentation
Presentation is loading. Please wait.
Published byEdwin Robbins Modified over 9 years ago
1
Weekly Meeting 6 October 23rd, 2013
2
PDR Amherst bike shop visit Cap self discharge test ◦ 2.6V to 1.8V (800mV) in 60 hours ◦ No longer a concern Cornell Cup ◦ Wild Card Option ◦ Intel Atom processor October 22, 20132
3
Arrived finally 2500 RPM = 12.8 V (open circuit) ◦ Lower than quoted 2500 RPM = 12.0 V (220 ohm load) ◦ Better than expected Lower RPM and better diodes? 1.9A short circuit at 2500RPM October 22, 20133
4
TA: Generator back EMF ◦ Force to turn shaft multiplies by gear ratio ◦ Motor power vs force optimization problem Bike gear prototype may not be useful ◦ Only needed to determine optimal gear ratio Can be achieved with RPM meter and drill $14 on Amazon ◦ Better off building one configuration only October 22, 20134
5
http://www.amazon.com/professional-tachometer-Non- contact-revolutions- Measurement/dp/B00DGLU1YK/ref=sr_1_2?ie=UTF8&qid=1382 482344&sr=8-2&keywords=rpm+meter http://www.amazon.com/professional-tachometer-Non- contact-revolutions- Measurement/dp/B00DGLU1YK/ref=sr_1_2?ie=UTF8&qid=1382 482344&sr=8-2&keywords=rpm+meter 2.5 RPM to 100KRPM range No contact needed Reflective strip on generator Accurate to 0.05% Can help determine ratio before moving forward October 22, 20135
6
ECE webpage creation Presentation in 2 weeks Benchside meetings coming (4-5pm Thurs) ◦ describe individual MDR deliverables ◦ progress to date ◦ general project idea Peer review summary Discuss new prototyping ideas October 22, 20136
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.