Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405 (802)656-1072 (802)656-1075 fax

Similar presentations


Presentation on theme: "Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405 (802)656-1072 (802)656-1075 fax"— Presentation transcript:

1 Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405 (802)656-1072 (802)656-1075 fax schiarel@uvm.edu http://www.uvm.edu/~uvmppd Contact Information

2 What I Expect To Share With You Today Some general information about the Physical Plant Issues of mutual interest. OUR MISSION To maintain facilities, perform related services and provide responsible stewardship of the University of Vermont’s physical assets in support of the University’s mission.

3 Items of Interest From SGA Anti-Idling Policy, if there is not one, plans to create Plans to reduce the Carbon Foot Print Relationship with the wood chip burning facility that is down near the intervale

4 Great Staff In PPD They Do All The Work And Deserve All The Credit

5 Physical Plant Department 2009 About 190 Employees Heat/Chilled Plant HVAC CPR Shop Custodial Plumbing Electric Shop Asbestos/Lead Recycling/Solid Waste Administration Service Operations Material Management Grounds Energy Management Zone Maintenance Shops

6 Some Responsibilities of Physical Plant (What do we get involved in) *basically, everything

7 HVAC Repair Practices

8 Electrical Issues

9 Innovation And Technology

10 Grounds Work

11 At Times Taking On Other Roles

12 “Disclaimer” None Of The Previous Pictures Were Taken At UVM They Were Actually Taken At Dartmouth

13 Energy Management Pro-active Working with departments Eco-Reps Program $1 Million/year energy loan More proactive in repairs Working with utilities Real time metering Get message out to students/faculty/staff Rebates equate to about 10% of each dollar invested Condensate return 90%

14 Energy Management Continued Steam trap maintenance Central Steam system Back up fuel is.25% Sulfur (voluntarily) Central chilled water plant LEED Certifications Preventive Measures (maintenance, inspection) Control systems 70,000 points on campus Many lighting upgrades High efficiency motors Delta V Boiler Controls Steam lines Davis Center Dashboard Camus Growth 15%, reduction in steam demand by approximately 10% Enernoc Many others

15

16 Utilities Master Planning

17 Plant Controls System – Delta V

18 Central Chilled Water Plant

19 Utility Tracking Load Shed/Response

20 Life Safety Systems Sprinkler Valves Blue Lights Elevator Phones Exterior Doors General Safety In Rooms

21 Emergency Blue Lights

22 Questions