1 Team Software Process (TSPi) CS4320 Fall 2002

2 TSP Strategy Provide a simple process framework based on the PSP. Use modest, well-defined problems. Develop products in several cycles. Establish standard measures for quality and performance. Provide detailed role definitions. Use role and team evaluations. Require process discipline. Provide guidance on teamwork problems.

3 TSP Process Cycle 1 Launch Strategy 1 Plan 1 Requirements 1 Design 1 Implementation 1 Test 1 Postmortem 1 Cycle 2 Launch Strategy 2 Plan 2 Requirements 2 Design 2 Implementation 2 Test 2 Postmortem 2 Cycle 3 Launch Strategy 3 Plan 3 Requirements 3 Design 3 Implementation 3 Test 3 Postmortem 3

4 Life Cycle Phases Launch Strategy Plan Requirements Design Implement Test Postmortem Appendix D - Script DEV (p. 363)

5 Cycle Descriptions Launch – review course objectives – describe the TSPi structure and content – assign student teams and roles – describe the customer needs statement – establish team and individual goals Strategy – create a conceptual design for the product – establish the development strategy: decide what will be produced in each cycle – make initial size and effort estimates – establish a configuration management plan – Reuse plan – Risk Management

6 Cycle Descriptions (Cont’d) Planning – estimate the size of each artifact to be developed (SRS, SDS, code) – identify tasks to be performed; estimate time to complete each task; assign tasks to team members – make a weekly schedule for task completion – make a quality plan Requirements – analyze need statement and interview customer – specify the requirements – inspect the requirements – develop a system test plan

7 Cycle Phases Design – create a high-level design – specify the design – inspect the design – develop an integration test plan Implementation – use the PSP to implement modules/units – create detailed design of modules/units – review the design – translate the design to code – review the code – compile and test the modules/units – analyze the quality of the modules/units

8 Cycle Phases Test – build and integrate the system – conduct a system test – produce user documentation Postmortem – conduct a postmortem analysis – write a cycle report – produce peer and team evaluations

9 Motivation (Teamwork) The success or failure of a project is seldom due to technical issues. You almost never find yourself asking “has the state of the art advanced far enough so that this program can be written?” Of course it has. If the project goes down the tubes, it will be non- technical, human interaction problems that do it in. The team will fail to bind, or the developers will fail to gain rapport with the users, or people will fight interminably over meaningless methodological issues. -- Tom DeMarco

10 Common Team Problems Ineffective Leadership Failure to compromise/cooperate Lack of participation Procrastination Poor Quality Function Creep Ineffective peer evaluation

11 Teams – An aside from the text Motivation – How to get best from people. – Study of quality goals vs final product Teamwork – How to get best from team. Team Structure – Organization Matters

12 Team Project Pick either: – Change Counter – Program Analyzer Go through 1 cycle Plan for all cycles

13 TSPi Teams Five People Defined Roles (Read 384-393) – Team Leader – Development Manager – Planning Manager – Quality/Process Manager – Support Manager Project Bid Table 3.3

14 LAUNCH!!! Script LAU1 First Team Meeting Use Meeting Script Meeting Goal: – Gather and analyze team data on project – Update Personal Task/Schedules prior to meeting – Produce Weekly Report Start Project Notebook

15 TSP Planning Overview STRAT Produce Conceptual Design Develop the Strategy Make Size Estimates Produce Team Plan Produce Quality Plan Produce Final Team Plan Balance Team Workload Make Team Member Plans Make Personal Plans STRAT SUMS SCHEDULE SUMQ TASK SCHEDULE TASK TASK SCHEDULE TASK SCHEDULE SUMQ SUMS SUMP

16 Development Strategy Plan the flight, fly the plan. Gain common understanding of work Basis for tracking work Non-artificial project date

17 Script STRAT1 Conceptual Design – How will I build this product? – What are principle components? – What functions do components provide? – How big are components? This is a planning design—not THE design!!

18 Cycle Planning(418 Strat Form) RefFunctions123123 1.1Compare mod prog to prev verX 1.2ID added and deleted LOC18018 1.6Provide Change Label Header505 Cycle LOCCycle Hours

19 Risk Assessment ID significant risks Rate High, Medium, Low according to : – Likelihood of occurrence – Impact on project Team members track all risks not LL Risks entered on form ITL (page 405)

20 Change Management Copies of each version of product Record of all changes made Who made change When change was made What change was Why change made

21 Development (This cycle) Produce Conceptual Design Develop the Strategy Make Size Estimates Produce Team Plan Produce Quality Plan Produce Final Team Plan Balance Team Workload Make Team Member Plans Make Personal Plans STRAT SUMS SCHEDULE SUMQ TASK SCHEDULE TASK TASK SCHEDULE TASK SCHEDULE SUMQ SUMS SUMP

22 Development Script (PLAN Script) SUMS (Page 433) – Include not just code, but all work products TASK (Page 438) – From individual PROBE estimates – 10 Hour Individual Threshold SCHEDULE (Page 417) – Map from TASK forms – Use Estimate of Weekly Hours for Team Quality Plan (Page 426-429) – SUMP, SUMQ

23 Excel Form

24 Excel TASK Form

25 Excel Form SCHEDULE

26 Excel SUMQ

27 Excel Time Log LOGT

28 Excel Defect Log LOGD

29 Load Balancing Use whole team Produce Plans first Next produce work matrix Balance work using matrix

30 Load Balancing Matrix Bob Task 1 Fred Task 2

31 Homework #3 Details Teams work to plan entire project Work on cycle 1 Try to do some amount of coding SRS – Addendum to Needs Statement Design – Templates or UML or ??? Code – Try to deliver some code, so you can do the implementation/test scripts You have 3 weeks. May use excel tool, or do manually with forms. Turn in all artifacts except source code itself.