PV Pumping Systems for domestic water supply. R. EYRAS O. PERPIÑÁN J. HUNGRÍA I.RAI Montalbán, 9. 28014 Madrid E-mail: isofoton@isofoton.com 19th European Photovoltaic Solar Energy Conference and Exhibition CASES OF STUDY
2
CONTENTS: Field experiences Hardware Evolution Bos Evolution Hydraulic Systems Evolution Conclusions Results
3
GENERAL LAYOUT
4
YearTypeMaroccoAlgeriaTunisia The Gambia (*) PV Generator kWpTotal kWpDelivery/Day m4 Status % 1996M21 1,50 756100 1996M32 2,264,522289100 1996M43 3,009,004398100 1996M52 3,767,523441100 1998M12 0,751,50445100 1998M21 1,50 510100 1998M33 2,266,783414100 1998M43 3,009,004820100 1998M61 5,26 3075100 2002/03P2 20,440,88552100 2002/03P4 31,985,943554100 2002/03P5 92,9726,7318526100 2002/03P6 33,9611,886900100 2002/03P7 25,2810,566453100 2002/03P8 15,94 4189100 2002/03P9 17,04 4750100 2002/03P10 37,9223,7616057100 2002/03P12 29,9019,8015420100 2003/04Meda 1503 1,6012,8084050 2003/04Meda 21045 3,0057,00174050 2003/04Meda 3511 4,5031,50261050 2003/04Meda 4954 8,50153,00550050 2002 10 1,1011,00400100 2003 10 1,1011,00400100 TOTAL kWp435,41
5
Hardware Evolution 1996 Solar Inverter + Solar Pump 1999 Frequency Converter + AC Centrifugal Pump + Control Board 2002 Frequency Converter + AC Centrifugal Pump + PLC
6
Bos Evolution: support structures 1996 Floor 1997 Roof 1999 Roof 2002 Roof Abdi Nilemchane Imzoughen
7
Hydraulic Systems Evolution 1996 Level Sensor Pressure Switch 1999 PLC “Overlevel” Pipe 2002 Programación Pressure Switch Marruecos Gambia Meda
8
RESULTS: Sizing Operation Social Aspects
9
Results 1
10
Results 2
11
Results 3
12
Conclusions Frequency Converters: –Reliability –Cost effective –Efficiency Sizing charts Social aspects: key point