Presentation is loading. Please wait.

Presentation is loading. Please wait.

COST Action E24 Helsinki meeting 27-28 november, 2003.

Similar presentations


Presentation on theme: "COST Action E24 Helsinki meeting 27-28 november, 2003."— Presentation transcript:

1 COST Action E24 Helsinki meeting 27-28 november, 2003

2 COST Action E24 Helsinki meeting 27-28 november, 2003 Agenda 2, 3 or 4 sessions in parallel Session 1: short term properties Session 2: Creep, DOL, moisture effects Session 3: Size effects, system effects Session 4: Design of timber joints Components Systems

3 COST Action E24 Objectives: General: specifications for a level 1 PMC, including methods and case studies For each topic: Organisation into sub-chapters Justification of assumptions Description of methods Proposal of case studies Distribution of tasks Dissemination: book, CD, Demonstration tools …

4 COST Action E24 Level 1 probabilistic model code Summary of Zürich conclusions Level of sophistication: RV discretisation, time invariant models Short term strength: LN tail fitting for timber and EWP, correlation models (other properties than bending strength) DOL: time invariant probabilistic formulation Size effects: parametric equation based height/length effects on material strength and stiffness System effects: discretisation into components arranged in logical systems (e.g. serial /parallel). Linearisation and iterative processes.

5 COST Action E24 Agenda 27/11 09:00 – 10:00Introduction 10:15 – 16:00Working sessions 16:15 – 17:00Plenary session 28/11 09:00 – 10:00Working sessions (Ctd) 10:15 – 12:30Reporting 14:00 – 15:30Future work and meetings 16:00 – 17:00Steering Committee Meeting

6 COST Action E24 Working plan For each session: 4/5 delegates (with possibility of participating to several sessions) A chairman for each session  Defining bounds of « level 1 » approach (Research and application)  Interactions with national codes/eurocode5  Defining key subjects (e.g. refering to materials, type of actions, diagnostic…)  Proposing case studies  Links with other topics

7 COST Action E24 Relevant documents (web site): STSM reports from: J. Koehler G. Turk J.W. Van de Kuilen Papers from: H.J. Larsen Model code for reliability based design of timber structures (draft not available on the web site) T. Toratti and A. Ranta Maunus A discussion on the introduction of wood to the JCSS probabilistic model code (Zürich workshop)

8 COST Action E24 Plenary session 28/11 Future work and meetings Report of activities: - A general introduction to the activity of COST Action E24 (P. Castéra, F. Casciati, M. Faber, H.J. Larsen) - Contents of workshops -Thematic state of the art reports (to be discussed) -Individual reports of activities Dissemination of results (WCTE, CIB,..) An international conference in 2004? Implementation of the « level 2 » approach

9 COST Action E24 Steering comittee meeting 28, november 2003


Download ppt "COST Action E24 Helsinki meeting 27-28 november, 2003."

Similar presentations


Ads by Google