1
ATML Status Oct 2005 An overview of the ATML activity in the ATML focus group and as part of the IEEE SCC20 sub-committee
2
ATML ATML’s mission is to define a collection of XML-based schemas that allows ATE and test information to be exchanged in a common format adhering to the XML standard ATML defines a framework through which different architectures using XML can be implemented. defines the components from which users can build their architectures, whilst being interoperable with other compliant architectures. Show examples of the net centric services by which this information can be exchanged across different ATS platforms as part of a maintenance process defines the XML format that these elements will take. The ATML specifications will define: How to define XML schemas that represent ATE and test information A set of XML schemas supporting the exchange of specific ATE and test information Example services that can be used for exchanging ATE and test information in a distributed net-centric environment. A set of services supporting the exchange of specific ATE and test information in specific common areas.
3
ATML Framework Instrument Description Test Station (1671.2)
Test Adaptor Diagnostics (1232) UUT Description (1671.3) Test Configuration Test Description (1671.1) SIMICA 1632 Started Test Results (1632.1) Drafts 1 Reviewed Draft Candidate
4
SCC20 & ATML Organisations
The IEEE SCC20 is the standards organisation through which the ATML components (Documents) will be published under various IEEE standards. The ATML organisation is an open, independent focus group contributed to by the ATE industry and government agencies to advance the common exchange of test information through the use of XML. The ATML group provides draft schemas and associated documents, examples, use cases, requirements and trials any ATML components Their findings are submitted to the various SCC20 sub-committees and working groups to advance the IEEE standards associated with the ATML components
6
SCC-20 ATML PARs Status Project Authorisation Request (PAR) need to be approved by the IEEE NESCOM prior to any SCC-20 working group being established. ATML Framework PAR 1671 Approved Diagnostics PAR 1232 Existing Test Results PAR Approved Test Description PAR Approved Instrument Description PAR Approved UUT Description – PAR Review Approved Steering Test Configuration - PAR Review April 2006 Test Station &Test Adapter - PAR Review April 2006
7
ATML Objectives & Goals
To have the P1671 standard written, reviewed and a ballot called by mid-2006, in order to be in a position to submit as a standard by Q4 2006 To have Candidate Schemas available by End ‘05 for Test Results Instrument Description Diagnostics (AI-ESTATE 1232) To have Draft Schemas available by End ‘05 and Candidate schemas for early ‘06 Test Description UUT Description To have Draft Schemas available by Early ‘06 and candidate schemas for end of ‘06 Test Adaptor Test Station Test Configuration SIMICA (Joe’s work)
8
ATML/IEEE Schedule (TII)
TII Sub-committee Operating Instructions (April 2005) √ ATML Framework 1671 (Chris Gorringe/Mike Seavey) IEEE Par Approved (Nov 2004) √ ATML Framework Draft (Review April 2005) √ ATML Framework Requirements (Review April 2005) √ ATML Framework Draft Document (H) (Oct 2005) √ ATML Framework Ballot (May 2006) UUT Description (John Ralph) Requirements (April 2005) √ Draft Schema (Review June 2005) √ Draft 2 Schema review (October 2005) Ballot Date (2007) Test Configuration (Tim Davis) Start (April 2005) √ Requirements (July 2005) √ Draft Schema (Review Oct 2006) √ Ballot date (2008) Capability (Dan Pleasant) Requirements (Sept 2005) √
9
ATML Schedule (DMC) Diagnostics (Tim Wilmering)
AI-Estate Amendment (Dec 05) (a) AI-ESTATE (1232) is working on an update to the published standard. The PAR has not yet been approved by the IEEE-SA (it missed the deadline for the Standards board meeting). P1636 SIMICA Draft (April 2006) (Joe Stanco) (b) SIMICA is working to get to an initial Ballot. Diagnostic Candidate (Jan 2006) Ballot (Jan 2007) Test Results (John Ralph?) ATML Candidate (Dec 2004) √ PAR Approved (Mar 2005) √ DMC Requirements Document (Review April 2005) √ Draft (Review April 2005) √ Draft 2 posted with DMC (Oct 2006) √ Test Results Ballot (Jan 2006)
10
ATML Schedule TAD Test Description P1671.1 (Ion Neag)
Draft Schema review (Oct 2005) The spec is developed by Mike Seavey and Ion They handle separate sections that we will merge when creating the Draft version. Candidate Schema (Jan 2006) PAR (Oct 2005) √ Ballot Date (Jan 2007) Instrument Description P (Teresa Lopes) Draft Schema review (July 2005)√ Ballot Date (May 2007) Test Station & Test Adapter (Tamara Einspanjer Start (April 2005) √ Requirements (July 2005) √ Draft Schema (Oct 2006) Ballot date (2008)
11
ATML Meeting Schedule Bi-Weekly Teleconferences
4 Meetings a year plus additional break-out working group as necessary Synchronise with SCC20/01 meetings Oct 25-27th Austin Tx (NI) Jan 17-19th Orlando (LM) April/May SCC20 Madrid (Indra?) July/Aug TBD ATC2006 Anaheim – SCC20, TII Management Only Oct/Nov TBD