STATUS OF THE DAMAGES CAUSED DUE TO TORRENTIAL RAIN/FLASH FLOOD DURING THE IST WEEK OF SEPTEMBER 2014.

Similar presentations


Presentation on theme: "STATUS OF THE DAMAGES CAUSED DUE TO TORRENTIAL RAIN/FLASH FLOOD DURING THE IST WEEK OF SEPTEMBER 2014."— Presentation transcript:

1 STATUS OF THE DAMAGES CAUSED DUE TO TORRENTIAL RAIN/FLASH FLOOD DURING THE IST WEEK OF SEPTEMBER 2014

2

3 1. Area : 4500 Sq. KMs 2.Population (As per Census 2011) : 4,09,936 3. No. of households : 79936 4. Sex Ratio : 922/1000 5. Literacy Rate : 65.97 % 6.No of Revenue villages : 402 7.No. of Sub-Divisions : 04 8.Tehsils : 16 9.No. of CD Blocks : 17 District Profile

4

5

6 Sl. No. DesignationAs per SOP 1ADDCChairman 2AC(R)Member 3Executive Engineer (R&B) ConcernedMember 4Tehsildar ConcernedMember Co-opted Members 1Sub Divisional Magistrates ConcernedCo-opted Member 2SHO ConcernedCo-opted Member Committee regarding assesment of Damages to the Private Property (Immovable):-

7 Sl. No. DesignationAs per SOP 1ADDCChairman 2Chief Animal Husbandry OfficerMember 3Distt. Sheep Husbandry OfficerMember 4Tehsildar ConcernedMember Co-opted Members 1AC (R)Co-opted Member 2 Sub Divisional Magistrates Concerned Co-opted Member 3SHO ConcernedCo-opted Member Committee regarding assessment of Loss of Milch Animals/ Draught Animals:-

8 Sl. No. DesignationAs per SOP 1ADCChairman 2Chief Agriculture OfficerMember 3Distt. Horticulture OfficerMember 4Tehsildar ConcernedMember Co-opted Members 1AC (R)Co-opted Member 2Chief Horticulture OfficerCo-opted Member 3Sub Divisional Magistrates Concerned Co-opted Member

9 Sl. No. DesignationAs per SOP 1ADDCChairman 2Superintending Engineer (R&B)Member 3Superintending Engineer (Hyd))Member 4Superintending Engineer (EM&RE)Member 5Superintending Engineer (PMGSY)Member 6Chief Planning OfficerCo-opted Member 7Executive Engineer (R&B) ConcernedMember 8Executive Engineer (PMGSY) ConcernedMember 9Executive Engineer (EM&RE) ConcernedMember 10Executive Engineer (PHE) ConcernedMember 11Executive Engineer (I&FC) ConcernedMember 12 Executive Engineer (REW) ConcernedMember 13 Executive Engineer (STD) ConcernedMember 14 Executive Engineer (BDA) ConcernedMember 15 Executive Engineer (ULB) ConcernedMember 16 Tehsildar ConcernedMember 17 Co-opted Members 18 Asstt. Commissioner (Dev)Co-opted Member 19 AC (R)Co-opted Member 20 Sub Divisional Magistrates ConcernedCo-opted Member Committee regarding assessment of damages caused to Public infrastructure:-

10 Sl. No.Designation 1ADCChairman 2AC(R)Member 3Chief Medical OfficerMember 4BMOs ConcernedMember 5DSP (HQ)Member 4Tehsildar ConcernedMember Co-opted Members 1Sub Divisional Magistrates ConcernedCo-opted Members 2SHO ConcernedCo-opted Members Committee regarding verification of Human loss/ injuries

11

12

13

14

15

16

17

18

19

20

21 Tehsil-wise amount paid for Severely/Partially damaged Pacca Houses S. NoTehsilFully damagedSeverely damagedPartially damaged No.AmountNo.Amount 1Assar000000 2Bhagwah00033780000 3Kastigarh000000 4Doda00000726600 5Bharat000000 6Marmat00011260000 7Mohalla000000 8Gundna000000 9Thathri000000 10Kahra000000 11Phigsoo000000 12Chiralla000000 13Gandoh000000 14Chilly Pingal000000 15Bhaderwah0000013800 16 Bhalla000000 Total;-0004504000830400

22 Tehsil-wise amount paid to Damaged Kaccha Houses S. NoTehsilFully damagedSeverely damagedPartially damaged No.AmountNo.AmountNo.Amount 1 Assar 0470400000920700 2 Bhagwah 081408002595000115264500 3 Kastigarh 1933440077292600325747500 4 Doda 0610560031117800101232300 5 Bharat 047040003114000716100 6 Marmat 101760001141800100230000 7 Mohalla 0470400041520046105800 8 Gundna 0014532002762100 9 Thathri 0005190002864400 10 Kahra 0235200001227600 11 Phigsoo 023520000012300 12 Chiralla 01176000138001943700 13 Gandoh 16281600028360083190900 14 Chilly Pingal 00003785100 15 Bhaderwah 0470400003785100 16 Bhalla 0005190001023000 Total;-8014080001987524009572201100

23 Tehsil-wise amount paid to Damaged (CATTLE SHEDS) S. NoTehsilCattle Sheds damaged No.Amount Paid 1Assar0812000 2Bhagwah1319500 3Kastigarh111166500 4Doda104156000 5Bharat046000 6Marmat6496000 7Mohalla1827000 8Gundna1218000 9Thathri0710500 10Kahra011500 11Phigsoo011500 12Chiralla057500 13Gandoh00 14Chilly Pingal011500 15Bhaderwah046000 16Bhalla057500 Total;-358537000

24 Details of Damages caused to Human Life/ Live Stock/ Cattles. S NoTehsilEx-gratia paid in death cases Ex-gratia paid in Injured cases Ex-gratia paid for cattle losses Ex-gratia paid for Sheep/Goat Losses. No.AmountNo.AmountNo.AmountNo.Amount 1Assar 00000000 2Bhagwah 0000141380002713200 3Kastigarh 0115000001930003450000914850 4Doda 000321700023280000 5Bharat 0000021500000 6Marmat 00000000 7Mohalla 0000022640000 8Gundna 00000000 9Thathri 00000000 10Kahra 00000000 11Phigsoo 00000000 12Chiralla 00000000 13Gandoh 00000000 14Chilly Pingal 00000000 15Bhaderwah 00000000 16Bhalla 00000000 Total;-011500000431000232572003628050

25

26

27 STATUS OF UTILIZATION OF FUNDS UNDER SDRF IN RESPECT OF DISTRICT DODA 2014-15 S. No Funds received (Rs. In lakhs) Funds disbursed for paymentb of Ex-Gratia Funds released for temporary restoration of public infrastructure Grand Total Additional requiremen t of funds Human Deaths Human Injuries Kacha Houses Pacca Houses Cattle Shed Cattle loss TotalPWDPHEI&FCPDDTotal 11165.001.50000.3410046.3990.80805.432.852557.330510.0040.0055.0010.00115.00172.33050.00 Total Availability = Rs 1165.00 lacs Funds released to the executing agency = Rs 172.3305 lacs Funds available with this office as on date = Rs 992.67 lacs Funds utilized so far = Rs 154.831 lacs

28 S. N O: SectorNature of damages Total damages to the public utilities. Funds projected for permanent restoration of public utilities Funds projected by Deptt. for temporary restoration. Amount recommended by SOP committee 01R&BDamages to the roads and Bridges. 2622.451486.81 1135.64200.00 02PMGSYDamages to the roads. 370.20276.50 93.7070.00 03PHEDamages to the water supply schemes 364.85198.15 166.7080.00 04PowerDamages to the sub stations/ conductor length, towers. 262.53131.21 131.3260.00 05IrrigationDamages to the Khuls. 392.84242.80 150.0450.00 06Flood Control Flood protection works 233.3687.46145.90 30.00 07EducationDamages to the school buildings/ kitchen sheds, R/Walls, B/Walls, toilets. 36.600 36.60 20.00 08Health.Damages to the health institutions/buildings. 21.000 21.00 7.00 09Rural Dev. Deptt Damages to the CD works and buildings. 244.00211.61 32.395.00 10FisheriesDamages to the Channels. 7.005.00 2.001.00 11Municipal Committees Damages to the works. 464.25317.75 146.5070.00 12JKPCC RoadsDamages to the Roads13.900 4.00 Total: 5032.982957.29 2075.69 597.00 DETAILS OF FUNDS PROJECTED BY VARIOUS DEPARTMENT FOR RESTORATION OF DAMAGED PUBLIC INFRASTRUCTURE AND AMOUNT RECOMMENDED BY SOP COMMITTEE AFTER RANDOM VERIFICATION OF DAMAGED INFRASTRUCTURE. Rs.in lacs ()()

29 Public Health Engineering (Rs.in lacs) Number of Schemes in the District242 Number of Schemes damaged193 Number of works taken up180 Number of works completed174 Number of works pending19 Amount required for temporary restoration Rs.166.70

30 Roads damaged in District70 No. of Roads Restored in the District70 Amount required for temporary restorationRs.1135.64 Roads and Bridges (Rs.in lacs)

31 No. of Roads Damaged 58 Roads Restored 56 Amount required for temporary restoration Rs. 93.50 C PMGSY: (Rs.in lacs)

32 No. of Trangries /wooden foot bridges damaged 09 Amount required for temporary restoration Rs.19.50 D. FOREST: (Rs.in lacs)

33 Status of Temporary restoration of damages Public Infrastructure. No.of works damaged.No. of works taken.No of works completed No.of works pending. 542 wooden poles. 1088 uprooted wooden poles 417 Km HT/LT loosened/ snapped conductors 86 Transformers. 140 Km conductors replacement (HT) 33 KV line 10 No. 33 /11 KV R/Stn. 542 wooden poles. 1088 uprooted wooden poles 417 Km HT/LT conductors 86 Transformers. 140 Km conductors replacement (HT) 33 KV line 10 No. 33 /11 KV R/Stn. 222 wooden poles. 1038 uprooted wooden poles 417 Km HT/LT conductors 36 Transformers. 21 Km conductor (HT/LT) 33 KV line 10 No. Temp. restored. 33 /11 KV R/Stn. 320 50 0 50 119 km Stabilization of works of lines under progress Stabilization of R/Stn.under progress. POWER

34 No. of works damaged63 No. of works taken up51 No. of works completed46 No. of works pending17 Amount required for temp. RestorationRs. 150.04 IRRIGATION (Rs.in lacs)

35 No. of works damaged34 No. of works taken up34 No. of works completed11 No. of works pending23 Amount required for temp. RestorationRs.145.90 Flood Control (Rs.in lacs)

36 No. of school buildings/Kitchen sheds/toilet Blocks R/Wall, B/Walls damaged. (6 fully damaged and 66 partially Damaged) 72 Amount required for Temp. Restoration Rs.36.60 EDUCATION (Rs.in lacs)

37 No. of buildings damaged 04 Amount required for temp. Restoration Rs.21.00 HEALTH (Rs.in lacs)

38 No. of buildings / Community Works damaged 2589 Amount required for temp. Restoration Rs. 32.39 RURAL DEV. DEPARTMENT (Rs.in lacs)

39 Water intake channel of Fish Farm Bheja Bhaderwah damaged. -- Amount required for temp. Restoration Rs.2.00 FISHRIES (Rs.in lacs)

40 No. of works damaged 73 No. of works Restored 28 Amount required for temp. Restoration Rs.146.50 MUNICIPAL COMMITTEES (Rs.in lacs)