Download presentation
Presentation is loading. Please wait.
Published byVincent Park Modified over 9 years ago
1
1 FIELD SUPPLY MAINTENANCE ANALYSIS OFFICE (FSMAO) Way Ahead Rich Stauffer Log Policy and Capabilities Branch 7 May 2013
2
2 INTENT With GCSS-MC TFI complete, FSMAO will transition to traditional analysis, compliance, and assistance role. FSMAO will enhance unit readiness and operational availability of equipment, and assist in continuous improvement of GCSS-MC enabled equipment accountability, readiness reporting, and maintenance management practices for commanders and the chain of command.
3
3 FSMAO LOOs Analysis/Compliance –Scheduled; alignment with order, directives, procedural guidance –FSMAO-WP will continue with formal analysis –FSMAO-E/W will conduct assistance/informal analysis through FY-14 Assist Visits –As requested; available to augment command capabilities Auditability –Existence & Completeness/Internal Controls assessment IAW Financial Improvement and Audit Readiness (FIAR) guidelines MOS and Logistics Process & Systems Training –Over-the-shoulder training and assistance –Includes GCSS-MC
4
4 FSMAO Will… Assist in the interpretation of USMC policies and directives. Identifying causative factors that contribute to procedural problems. Assist/recommend corrective actions or improvements. Identify trends from analyses and assist visits. Instruct/assist personnel in procedural techniques and log systems. Inform the chain of command regarding significant discrepancies, trends, and related causes. Provide tailored feedback to drive improved GCSS-MC sustainment training as well as identify and socialize GCSS-MC best practices. Upon request and when supportable, provide tailored assistance visits for supply, maintenance, and log systems process and procedures. Conduct GCSS-MC assist visits to the extent feasible.
5
5 Analysis Trends General Observations/Trends Discrepancies were due to the lack of basic Supply, Maintenance Management, and Maintenance MOS knowledge, processes, and procedures –GCSS-MC will not correct a lack of basic skills, but amplifies them Officer and Staff NCO involvement is critical to success and is reflected in the analysis results GCSS-MC Procedural Notices (GPN) are not being effectively distributed, explained and trained Supply Average of 3 X findings per analysis No Supply commodity has received a compliant score Loss of property control (67%) - Adjustments to record without proper approval –Not maintaining documentation for audit trails –Discrepancies not investigated, researched, or corrected –Mismanagement of the Installed Base creates a loss of accountability Lack of requisition management (50%)
6
6 Analysis Trends (contd) Maintenance Management Average of 4 X findings per analysis Readiness reporting of MRR assets on the Equipment Status Report (ESR) is inaccurate –Inaccurate reporting of allowances and on hand quantities (67%) –Inaccurate reporting of equipment readiness status (69%) MMO’s not conducting validations to identify requisitioning delays (41%) Maintenance Average of 13 X findings per analysis Improper management of PMCS scheduling, conduct and documentation (66%) Improper maintenance work flow within GCSS-MC –Service Requests (SR) are not being “Accepted” in GCSS-MC (Date Received In Shop (DRIS) counters not initiated) Lack of inventory control in GCSS-MC (63%) –Open purchase SL-3 Tools are repair parts are not being tracked properly –Management of sub-inventories (parts debriefs and inventory adjustments) AA&E - Daily Sight Counts showed discrepancies without documentation or justification (39%)
7
7 Analysis Trends General Observations/Trends Discrepancies were due to the lack of basic Supply, Maintenance Management, and Maintenance MOS knowledge, processes, and procedures –GCSS-MC will not correct a lack of basic skills, but amplifies them Officer and Staff NCO supervision is paramount to success Ensure Marines attend GCSS-MC training Read and implement the GCSS-MC Procedural Notices (GPNs) Supply Inaccurate Mechanized Allowance List (MAL) on-hand balances (73%) Loss of property control (74%) –- Adjustments to record without proper approval –Not maintaining documentation for audit trails –Discrepancies not investigated, researched, or corrected –Mismanagement of the Installed Base creates a loss of accountability Lack of requisition management (63%)
8
8 Analysis Trends (contd) Maintenance Management Inaccurate readiness reporting of MRR assets on the Equipment Status Report –Inaccurate reporting of allowances and on hand quantities (22%) –Inaccurate reporting of equipment readiness status (23%) Maintenance Improper management of PMCS scheduling, conduct and documentation (71%) Lack of inventory control in GCSS-MC –PEBs not properly managed and validations not conducted (78%) –SL-3 inventories improperly conducted, missing SL-3 not on order (64%) AA&E –Discrepancies in daily sight counts without supporting documentation or justification (76%)
9
9 QUESTIONS ?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.