Download presentation
Presentation is loading. Please wait.
Published byGary Wilkins Modified over 9 years ago
1
TFS 2010 What’s new and interesting
2
Key Items Agile Planning Tools – Slides #3-#6 Improved parallel development - Slides #7-#8 Continuous Integration ++ – Slide #9 Architectural validation integration with build –Slide #10 Team Build enhanced – Slides #11-#12 Hierarchical Work Items, easier Project Management – Slide #13 Easy TFS Manageability – Slide #14 Explore more… - Slide #15
3
Agile planning tools Visual Studio Team System (VSTS) 2010 introduces new features and capabilities to help agile teams with planning Agile teams opt for multiple levels of planning with course corrections over a waterfall-style plan Support for Agile type of planning VSTS 2010 introduces two new Excel workbooks for Release planning and Iteration planning These excel based planning work books are closely integrated with TFS – Product backlog and iteration backlog synchronized to automatically capture the status of a user story or a task work item 1. Broad set of features or User stories 2. A list of requirements desired by customers in an application 1. High-level user stories from the product backlog are reviewed and are broken down in to smaller user stories 2. These user stories and associated tasks are then estimated in hours.
4
Agile workbooks Product Backlog workbook - Primarily serves as a list of requirements desired by customers in an application Iteration Backlog workbook
5
Capacity planning Capacity planning spreadsheet - specify the date range for iterations, the number of team members, and any interruptions during the iteration, such as holidays. This data, combined with the user story estimates and velocity, creates a chart that gives a sense of what the iteration work load looks like Velocity calculation - amount of work being completed by the team in an iteration & capacity planning spreadsheet can pull the historical data from the TFS data warehouse More reports like Burndown and Velocity, Remaining Work, and Stories Progress come with Agile template
6
Integrated view Product backlog worksheet Team tab Work Items group Configure List
7
Parallel Development Visualize branch relationships Folders and branches have a different appearance and different capabilities Hierarchy of a Team project
8
Tracking ChangeSets/Merges Track Merge timelines Track ChangeSets across branches
9
Continuous Integration ++ Gated Check-In Bring more stability to the build process Be proactive – don’t let a build to fail.. Stop that change before it breaks the system Reduce code change roll backs A mechanism to validate developer changes on a clean box with TIP version Take the latest code available, take developer changes, compile on a central build server If successful -> Check-In the change If not -> reject the change [optionally, can create bug WI to track that to closure]
10
Architectural validation on every build Specify the layers of Architecture Map P hysical implementation to Logical architecture [ drag the actual class implementations into the corresponding layer] Generate dependenciesMake correctionsValidate ArchitectureIntegrate this with every build.. Get physical and logical in sync, enforce that through automation Generated dependencies Validation
11
Team Build Architecture enhanced New architecture supports improved Build machine utilization Reduce number of build machines/project and build machine maintenance Each project collection is associated with a Build Controller Build Controller to manage the builds, build agents and load balance
12
Improved Build summary - Customizable WPF reports 1.Last 9 build status of the same build definition 2.Small triangle denotes current build 3.Height shows time taken for each build 4.Color shows the result 5.Hover over each bar and get more information…
13
Hierarchical Work Items Great enhancement towards task decomposition - breaking high level tasks down into sub-tasks and those down into further sub-tasks, etc Integration with Excel & MS Project
14
Easy maintenance Change all App tier settings at 1 place TFS logs integrated Manage Team Build settings
15
Explore more… References to explore all 2010 features Architecture (http://blogs.msdn.com/camerons/)http://blogs.msdn.com/camerons/ Development & Database (http://blogs.msdn.com/habibh/)http://blogs.msdn.com/habibh/ Lab Management (http://blogs.msdn.com/amit_chatterjee, http://blogs.msdn.com/lab_management)http://blogs.msdn.com/amit_chatterjeehttp://blogs.msdn.com/lab_management Test (http://blogs.msdn.com/amit_chatterjee, http://blogs.msdn.com/james_whittaker)http://blogs.msdn.com/amit_chatterjeehttp://blogs.msdn.com/james_whittaker TFS (http://blogs.msdn.com/bharry)http://blogs.msdn.com/bharry
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.