TeamConnection Proof of Technology Project John Campos
2
Project Goals Determine Suitability of TeamConnection for Visa Document Software Library Requirements Document Business Process Scenarios Recommend a Technical Approach Project Time Span - 3 Months
3
Current Environment LMC - Library Management Control –VM/CMS Based System –CMS Windows/Rexx –Source Code Repository Resides in Sourcebank –Foreground/CMS Batch Assemblies –CMS Batch “Grep” Function
4
Current Environment (Cont.) LRF - Load Request Facility –VM/ISPF Interface –DB Resides in ISPF Tables –Used to Manage Code Segments Throughout the Application Development Life Cycle
5
Current Environment
6
What We Did TeamConnection versus Current Visa Process (LMC/LRF)
7
Schedule Business Justification for Project Requirements Definition Test Plan Development Server Installation Client Installations MVS Build Processor Installation Perform Test Case Scenarios with IBM Process Findings Recommendation of Technical Approach
8
Core Team/Resources Application Development 3 People - Representatives from VM, TPF, and MVS Environments IBM Consultant Network Support Services
9
TeamConnection Environment TeamConnection 2.08 RS6000/AIX 4.1 Windows 95 Client Limited Build Processor
10
Execute Test/Process Results 80 Requirements 24 Scenarios Results in Access Database
11
Visa TeamConnection Approach LMC/LRF Dual Database VM/ESA 2.2.0 VM to AIX APIs TeamConnection 2.0 RS6000/AIX 4.1 TCP/IP
12
Visa TeamConnection Approach LMC/LRF Dual Database VM/ESA 2.2.0 VM to AIX APIs TeamConnection 2.0 RS6000/AIX 4.1 TCP/IP
13
Current Status Implementation of TeamConnection 2.0 Evolutionary Implementation of TeamConnection
14
Evolutionary Implementation