Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor, Technip USA Keith Wingfield- CAA Tech Center Engineering Consultant Chris LeBlanc- VP of Sales and Marketing, Lime Instruments Instructor: Professor Raresh Pascali Faculty Advisor: Dr. Mehendra L. Joshi
2
Outline Objective/Goals Purpose Lab Experiments Proposed Table Setup Market Research ▫Online survey ▫Current market offerings Design and Analysis ▫System Schematic ▫Thermodynamic Analysis ▫Process Analysis ▫Calculations ▫Parts Budget Risk Matrix Gantt Chart ▫Current ▫Future Sponsorship Lessons Learned Questions 2
3
Objective Create a compact, portable steam power plant trainer that will aid in the understanding of the Rankine cycle and automated system control 3 Goals Achieve fully automated system control Rolling frame for ease of transport ▫Dimensions of 4x2x3.5 feet Deliver the product complete with multiple lab experiments Produce an aesthetically pleasing product
4
Purpose Many students find difficulty understanding thermodynamics without being able to apply theory to real world application Steam power plants account for roughly 78% of the world’s electricity Students will learn the automated control system and will obtain a working knowledge of how to check transducer readings 4
5
Lab Experiments Plot power curve ▫Watts vs. Flow rate ▫Watts vs. % Valve Calculate cooling tower efficiency Calculate condenser efficiency 5
6
Proposed Table Setup 6
7
Online Survey Using Survey Monkey ▫110 respondents ▫10 questions Questions: 1.What is your age? 2.What type of engineering degree do you have? 3.What is the highest level of school or degree you have completed? 4.Did you take thermodynamics? 5.If so, did it require a lab section? 6.Did your thermodynamics class/lab include steam power plant training station? 7.Did you find the training equipment useful? 8. If the training equipment was not useful, why? 9. If you did not have training equipment, would you have liked to have one? Would it have been beneficial? 10. What is your alma mater? 7
8
Market Research Results 8
9
Current Market Offerings 9 $33,000$40,000Unknown Price$175,000-350,000
10
System Schematic 10
11
Analysis 11 T-S Diagram for Steam Process Diagram
12
Process Analysis 12 q in = 1123.035 Btu/lbm
13
Control Systems 13 National Instruments Compact Rio Donated
14
14
15
Steam Generator 15 Infinity Fluids Inline-instant Steam Generator 220V $2600.00 Model NumberA (in)B (in) C (FNPT Std.)D (in) Watts (kW)VoltsPhasesAMPS CRES-SG-12-0010-K129.75 1/42.01.012018 CRES-SG-12-0020-K129.75 1/42.0 120117 CRES-SG-12-0040-K1613.25 1/43.04.0240117 CRES-SG-12-0060-K1613.25 1/43.06.0240125
16
16
17
Valves 17 Assured Automation Control Valve ¼” Inlet-Outlet Full Port Ball Valve 0-2000 psi $695.00 Aquatrol Pressure Safety Valve Inlet: ¼” Overall Height: 2-7/8” Pressure Range: 0-200 psi Temperature Range: 0-406°F ASME Section VIII/CRN $75.00
18
18
19
Flow Meter 19 Simple Float style units or high resolution digital units Price Unknown
20
20
21
Pressure Transducers 21 Pressure Transducer Options Considerations Pressure range1525 Cost816 Ease of integration99 Response time44 Availability52 Total4156 ConsiderationsWeightMultiplier 1-5 Pressure range535 Cost424 Ease of integration333 Response time222 Availability152
22
Temperature Transducers 22 Thermocouple Options Considerations Temperature range1510 Cost812 Ease of integration99 Response time44 Availability53 Total4138 ConsiderationsWeightMultiplier 1-5 Temperature range532 Cost423 Ease of integration333 Response time222 Availability153
23
23
24
Turbine Pump 24 Purchasing v.s. Manufacturing Rankin Rollers
25
25
26
DC Motor 26 Ningbo Shengguang Motor Co. Voltage: 12 Volt Input Power: 1.8W, 2.5W, 7.0W Speed: 3880-9800 R.P.M. Price Unknown
27
27
28
Analog Display Gauges 28 Pressure Range: 0-50 psi Temp Range: -40-250˚F $38.70 Temp Range: 32-250˚F Price Unknown
29
29
30
Condenser Analysis 30
31
Manufactured Condenser Design 31
32
32
33
Recirculating Pump 33 Pump Options Considerations Pressure range2520 Cost816 Ease of integration99 Response time108 Availability55 Total5758 ConsiderationsWeight Multiplier 1-5 Pressure range5 54 Cost4 24 Ease of integration3 33 Temperature range2 54 Availability1 55
34
Budget 34
35
Risk Matrix 35 Severity Catastrophic 41,210 Severe 11 8 High 3 Medium 75 6 Low 9 PossibleHighVery HighDefinite Likelihood
36
WBS 36
37
Gantt Chart 37
38
Current Sponsors 38 Sponsorship Package
39
Lessons Learned Time management is key. Trust but verify. Ask team members for help when needed. 39
40
Contact Us Online: ▫http://cot-mect4276.tech.uh.edu/~kathishttp://cot-mect4276.tech.uh.edu/~kathis ▫www.rankinrollers.comwww.rankinrollers.com Facebook: ▫facebook.com/RankinRollerfacebook.com/RankinRoller Email: ▫RankinRollers@gmail.comRankinRollers@gmail.com 40
41
Questions?