1 Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor, Technip USA Keith Wingfield- CAA Tech Center Engineering Consultant Chris LeBlanc- VP of Sales and Marketing, Lime Instruments Instructor: Professor Raresh Pascali Faculty Advisor: Dr. Mehendra L. Joshi

2 Outline Objective/Goals Purpose Lab Experiments Proposed Table Setup Market Research ▫Online survey ▫Current market offerings Design and Analysis ▫System Schematic ▫Thermodynamic Analysis ▫Process Analysis ▫Calculations ▫Parts Budget Risk Matrix Gantt Chart ▫Current ▫Future Sponsorship Lessons Learned Questions 2

3 Objective Create a compact, portable steam power plant trainer that will aid in the understanding of the Rankine cycle and automated system control 3 Goals Achieve fully automated system control Rolling frame for ease of transport ▫Dimensions of 4x2x3.5 feet Deliver the product complete with multiple lab experiments Produce an aesthetically pleasing product

4 Purpose Many students find difficulty understanding thermodynamics without being able to apply theory to real world application Steam power plants account for roughly 78% of the world’s electricity Students will learn the automated control system and will obtain a working knowledge of how to check transducer readings 4

5 Lab Experiments Plot power curve ▫Watts vs. Flow rate ▫Watts vs. % Valve Calculate cooling tower efficiency Calculate condenser efficiency 5

6 Proposed Table Setup 6

7 Online Survey Using Survey Monkey ▫110 respondents ▫10 questions Questions: 1.What is your age? 2.What type of engineering degree do you have? 3.What is the highest level of school or degree you have completed? 4.Did you take thermodynamics? 5.If so, did it require a lab section? 6.Did your thermodynamics class/lab include steam power plant training station? 7.Did you find the training equipment useful? 8. If the training equipment was not useful, why? 9. If you did not have training equipment, would you have liked to have one? Would it have been beneficial? 10. What is your alma mater? 7

8 Market Research Results 8

9 Current Market Offerings 9 $33,000$40,000Unknown Price$175,000-350,000

10 System Schematic 10

11 Analysis 11 T-S Diagram for Steam Process Diagram

12 Process Analysis 12 q in = 1123.035 Btu/lbm

13 Control Systems 13 National Instruments Compact Rio Donated

14 14

15 Steam Generator 15 Infinity Fluids Inline-instant Steam Generator 220V $2600.00 Model NumberA (in)B (in) C (FNPT Std.)D (in) Watts (kW)VoltsPhasesAMPS CRES-SG-12-0010-K129.75 1/42.01.012018 CRES-SG-12-0020-K129.75 1/42.0 120117 CRES-SG-12-0040-K1613.25 1/43.04.0240117 CRES-SG-12-0060-K1613.25 1/43.06.0240125

16 16

17 Valves 17 Assured Automation Control Valve ¼” Inlet-Outlet Full Port Ball Valve 0-2000 psi $695.00 Aquatrol Pressure Safety Valve Inlet: ¼” Overall Height: 2-7/8” Pressure Range: 0-200 psi Temperature Range: 0-406°F ASME Section VIII/CRN $75.00

18 18

19 Flow Meter 19 Simple Float style units or high resolution digital units Price Unknown

20 20

21 Pressure Transducers 21 Pressure Transducer Options Considerations Pressure range1525 Cost816 Ease of integration99 Response time44 Availability52 Total4156 ConsiderationsWeightMultiplier 1-5 Pressure range535 Cost424 Ease of integration333 Response time222 Availability152

22 Temperature Transducers 22 Thermocouple Options Considerations Temperature range1510 Cost812 Ease of integration99 Response time44 Availability53 Total4138 ConsiderationsWeightMultiplier 1-5 Temperature range532 Cost423 Ease of integration333 Response time222 Availability153

23 23

24 Turbine Pump 24 Purchasing v.s. Manufacturing Rankin Rollers

25 25

26 DC Motor 26 Ningbo Shengguang Motor Co. Voltage: 12 Volt Input Power: 1.8W, 2.5W, 7.0W Speed: 3880-9800 R.P.M. Price Unknown

27 27

28 Analog Display Gauges 28 Pressure Range: 0-50 psi Temp Range: -40-250˚F $38.70 Temp Range: 32-250˚F Price Unknown

29 29

30 Condenser Analysis 30

31 Manufactured Condenser Design 31

32 32

33 Recirculating Pump 33 Pump Options Considerations Pressure range2520 Cost816 Ease of integration99 Response time108 Availability55 Total5758 ConsiderationsWeight Multiplier 1-5 Pressure range5 54 Cost4 24 Ease of integration3 33 Temperature range2 54 Availability1 55

34 Budget 34

35 Risk Matrix 35 Severity Catastrophic 41,210 Severe 11 8 High 3 Medium 75 6 Low 9 PossibleHighVery HighDefinite Likelihood

36 WBS 36

37 Gantt Chart 37

38 Current Sponsors 38 Sponsorship Package

39 Lessons Learned Time management is key. Trust but verify. Ask team members for help when needed. 39

40 Contact Us Online: ▫http://cot-mect4276.tech.uh.edu/~kathishttp://cot-mect4276.tech.uh.edu/~kathis ▫www.rankinrollers.comwww.rankinrollers.com Facebook: ▫facebook.com/RankinRollerfacebook.com/RankinRoller Email: ▫RankinRollers@gmail.comRankinRollers@gmail.com 40

41 Questions?


Download ppt "Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,"

Similar presentations


Ads by Google