Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mobile County Public School System District Technology Plan James Willcox Joanne Kline Yoko Nagashima.

Similar presentations


Presentation on theme: "Mobile County Public School System District Technology Plan James Willcox Joanne Kline Yoko Nagashima."— Presentation transcript:

1 Mobile County Public School System District Technology Plan James Willcox Joanne Kline Yoko Nagashima

2 The District 95 schools and 4000 students 80 miles north to south 120 building sites 62% of students on free and reduced lunch $18 million a year in Title I funds High central office efficiency: 2.5 % admin rate Largest district in the state Wide statewide variance in size

3 MCPS Technology Timeline 1991: Initial district-wide plan focus on teaching and learning 1993: Revived and expanded of Technology Committee: included central office 1996-1997: State planning requirements 1997: Comprehensive District Technology Plan 1998: WAN to all schools complete 2001: Wireless network in progress

4 Impetus for Acceptance Start Point: Business needs/efficiency –Failing mainframes –Windfall $ from the state “with no strings attached” –New leadership Lifetime total cost not a main concern –Political support –Need + Funds + Politics = execution Combined need was key Net Day –Big support from Bell South –Early participant

5 Technology Plan Today: Finances Major support from the federal government –“E-rate is a godsend” High poverty district gets more e-rate $$ (wiring) Allowed shortened installation timeline (7 years to1) –Title 1 funds: $18 million Local foundation grants and corporate donations –Some grant support (10-30K/school) –Mainly Title I schools

6 Professional Development 30% of tech budget reserved for tech training Tech training/staff supports skills and integration Voluntary, focused teacher training: computer incentives Teacher tech literacy standards enforced –Coordination with credentialing programs/schools of ed Established standards for classroom tech integration –Measuring tech use in classroom (survey, observation, eval.) –1 st results pending Selection process of site IT team / tech teachers –Criteria: knowledge = job

7 Technology & Research Partners Partnership with USA –In-service teacher technology training –Insufficient research support UNC – software research –Publish info to teachers and schools

8 District Technology: 2001 District installation of wireless network (upgrade from T1) –Network overloaded by extensive use –Lower maintenance cost (included in package) –Lower installation/upgrade expense –Voice over network (savings over 150K / year) Classroom hardware standards –Minimum: 2 PCs –Goal: 4 PCs Super Computer Authority –Provides ISP services through the State of Alabama

9 Future Concerns Personnel Struggling with long term/ongoing costs of IT End equipment for distance learning Will E-rate continue? Tough tradeoffs in budget Site-based management issues

10 MCPS Decision Making Committee based decisions –school/teacher participation Lifetime costs de-emphasized Business and T&L needs combined Dependence on –Outside research/review –Federal funds Dedication to training/integration/standards

11 Policy Implications Long term support plans critical Flexible policy with accountability are key Alternative / worst case should be identified Reserve funds for training, integration, measurement Plan, execute, evaluate, update Coalitions / combined needs critical –Approval –Efficient use of tech / funds / sustaining support


Download ppt "Mobile County Public School System District Technology Plan James Willcox Joanne Kline Yoko Nagashima."

Similar presentations


Ads by Google