Download presentation
Presentation is loading. Please wait.
Published byRoy Blake Modified over 9 years ago
1
1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010
2
Spaceport America 2 World’s first purpose-built commercial spaceport Designed for next-gen reusable space launch vehicles Anchor tenant Virgin Galactic w/20 year lease; ~$150-250M Vertical launch operations since 2006, horizontal operations in 12-24 months Economic Development, Tourism, Education
5
Advantages of Spaceport Location Ideal Conditions for Space Access Low Population Density Restricted Airspace 5 High Elevation Low Latitude
6
Runway Access & Internal Roads Underground Utilities Fuel Storage Terminal Hangar Facility ARFF/Maintenance/Ops Vertical Launch Area Spaceport Site Layout 6
7
7 Construction: Dreams to Reality 77
8
8 Photo used courtesy of Bob Martin 8
9
9 Construction: Dreams to Reality 99
10
10 Construction: Dreams to Reality Photo used courtesy of Bob Martin 10
11
11 Construction: Dreams to Reality 11
12
12 Construction: Dreams to Reality 12
13
Terminal Entrance Road 13
14
Terminal Entrance Road
15
15 Air Rescue Fire Fighting Facility 15
16
16 Aircraft Rescue and Firefighting Facility 16
17
17 Baseline: Where We Are Today Phase I Horizontal Launch Area Construction 80% Complete Runway Access & Internal Roads Underground Utilities Fuel Storage Terminal Hangar Facility ARFF/Maintenance/Ops Phase I Completion Scheduled for 1 st /2 nd Quarter 2011 AARON – Stunning Picture Here
18
18 Vertical Launch Complex UP Aerospace launch rail –Has hosted 4 sounding rocket-class launches (2 exceeded 100 km altitude) 4 sub-scale fly-back booster ACTDs Lunar lander pads completed in July 2009
19
19 Vertical Launch Complex Lunar Lander Pads Launch Rail and Roll-back Shelter Launch Control Wind Prolfiler
20
20 Vertical Launch Complex
21
21 ConstructionCommissioning Phase I Construction Phase II Infrastructure Construction Planning and Programming Design ConstructionCommissioning Operational Development Documentation Phased Readiness Preparation and Ramp-up Operational Start-up Operations Visitor Experience Programming and Design Procurement Visitor Facilities Facility Programming Construction Commissioning Planning Procurement Planning Procurement Design Installation Readiness Prep OperationsOperational Start-up Planning Future State: Where We’re Going 201120122010 Rough Timeframe
22
Continued Phase II Construction Site Infrastructure Expansion Visitor Experience Welcome Centers – Sierra County and Hatch Visitor Complex – On-site Spaceport Entrance Fit-out of NMSA space in THF Wayfinding – on-site and off-site Site Master Planning Utility extension to Visitor Complex Utility extension to VLA Vertical Launch Area Expansion Horizontal Launch Area Expansion On-site / Off-site (Southern) Roads AARON – Stunning Picture Here
23
23 Operations Services RFPs to be released throughout Q4 2010/Q1 2011 2.General Services: Facilities Maintenance Janitorial Ground Vehicle Maintenance Groundskeeping NMSA Fuel Handling Airfield Maintenance 1. Protective Services: Fire rescue Medical/EMT personnel Visitor Security Customer/Industrial Security Law Enforcement Crisis Management
24
24 Operations Services RFPs to be released throughout Q4 2010/Q1 2011 3. Technical Services: Ground Safety Flight Safety Mission Planning Airspace Management Scheduling 4. Visitor Services: Welcome Center Management Transportation Concessions Restaurants Retail / Merchandising Onsite Visitor Management Exhibits / Interpretive Content
25
25 Executive Director General Counsel Launch Operations Licensing Permitting Deputy Director Technical Division Operations Division Administrative Division Commercial Division Flight Safety Projects / Construction Planning / Development Spaceport Operations - General Services - Emergency Services - Security Services - Visitor Services - Environmental - Ground Safety - Tenant Relations FAA / WSMR Relations Human Resources Finance Admin Services Government Relations Branding / Marketing Media / PR Communications Organizational Structure Business Development - Industry Attraction - Tourism Development - Education / Workforce - Economic Development
26
Questions? Feel free to contact: Bill Gutman Technical Director New Mexico Spaceport Authority Bill.Gutman@spaceportamerica.com 901 E. University Ave Bldg 3 Suite C Las Cruces, New Mexico 88001 Phone: 575-373-6110 Fax: 575-373-6120 26
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.