Northstowe Phase 1 Infrastructure Works Construction Phasing
2
Established 1952 Based in Ipswich 7 regional offices 300 employees £70m turnover Introduction to Jackson
3
Regional office – Huntingdon Head office - Ipswich Support services Environment Health & Safety Quality Procurement Planning Locally based workforce
4
Over 35 contracts completed in Cambs since 2004
5
Addenbrookes Access Road
6
Cambridge Guided Busway
7
Bar Hill Roundabout
8
Huntingdon West of Town Centre Link Road
9
Site Access Overview
11
Site Compound Location
12
Compound Layout
14
some localised temporary diversions and temporary surfacing will be required
15
Only in operation 0930 to 1530 (Mon-Fri), occasionally Saturday 0800 to 1300
18
or temporary lighting as required
20
Proposed B1050 Reconstruction Works
21
Overall Northstowe Phase 1 Layout
22
Key points JCE long experience with local, similar schemes. Safe pair of hands Minimised impact of deliveries through recycling material, primary road access when possible, restricted access/egress using bypass. Maintain safe cycleway/footway at all times.