1 The Contaminated Sites Cleanup Process (18 AAC 75)

2 Cleanup Process – Overseen by ADEC A. Stop It 1. Initial Response (75.310) 2. Interim removal Action (75.330) B. Describe It 1. Site characterization (75.335) 2. Risk evaluation/cleanup levels (75.340-.350) C. Remediate It 1. Cleanup Plan (75.360) 2. Institutional Controls (75.375) D. Close It (75.380)

3 Immediate Response and Interim Removal Stop the immediate or current exposure

4 Step 1: Describe it – “assessment” or “characterization” What kind(s) of contamination? Where exactly is it? How could people, plants or animals come in contact with it?

5 Step 1: Describe it: Site Characterization Work plan

6 Step 2: Clean it up Most stringent levels  Groundwater must meet Federal drinking water levels Risk-based cleanup levels:  Are people or animals exposed?  Land use – residential? industrial? subsistence use?  Is the contamination spreading?

7 Step 3: Closure Once cleanup levels are met, the site is considered closed by DEC. If the strictest levels cannot be achieved conditions may be attached to the closure.

8 Before cleanup

9 Step 3: Closure

10

11 Before cleanup

12 Step 3: Closure Setting conditions

13

14 Step 3: Closure with Institutional Controls Institutional controls - examples  Deed restrictions against drilling wells or transporting soil or groundwater off site.  Responsible Party monitors contamination until cleanup levels are met.  Responsible Party must maintain a fence around, or a cap over, an area of contamination


Download ppt "The Contaminated Sites Cleanup Process (18 AAC 75)"