1 Outline detailed operations Model 04-02 Model 04-03 Model 04-04 general usage of ARENA
2
2 Electronic Assembly/Test System Sealer Part A EXPO(5) Part B Batches of 4 EXPO(30) Process A Tria(1,4,8) Process B Tria(3,5,10) Part A TRIA(1,3,4) Part B WEIB (2.5, 5.3) EXPO(45) Rework 9% 91% Shipped 20% Scrapped 80% Salvaged & Shipped
3
3 Models Model 4.1: basic Model 4.2: resource schedule, resource failure, frequency – time persistence statistics Model 4.3: changing animation queue, changing entity picture, adding resource picture, adding variables and plots Model 4.4: using modules in Advanced Transfer
4
4 Model 04-01 Model 04-01 ignore details the 2-minute traveling times the working hours of stations schedule of the re-workers failure of the sealer the number of racks used
5
5 Model 04.02
6
6 New Features of Model 04-02: Refinements of Model 04-01 run length 10 days, 16 hours per day two 8 hr shifts / day 1 re-worker in the first shift 2 re-workers in the second shift sealer may break down life time expo(120) repair time expo(4) statistics of the status of sealer: on and off statistics of the rework queue (distribution of # of racks) each rack possible to hold 10 items
7
7 Schedule of the Rework Station define schedule of re-workers (Schedule module) associate the schedule with the (resource of the) re-work station option on resource when a service is interrupted: ignore, wait, preempt modify the # of hours per day to suit the schedule
8
8 Failure of Resource define a failure (Failure module in Advanced Processes) associate the failure with a resource the treatment of incomplete work at a failure same as schedule: ignore, wait, and preempt
9
9 Collect Statistics to get time-in-system statistics of a type of entities (customer-average statistics) use Record module record exit time - creation time compile statistics to get time-persistent statistics of a collection of values of variables or a collection of states of resources use Statistics module (in Advance Process Template ) may need to self-define categories
10
10 Statistics for Racks and for Sealers time-persistent statistics – Statistics module statistics on sealer status fraction of idle, failed, and busy time of sealer statistics on number of racks needed fractions of time for different number of racks used
11
11 Model 04.03
12
12 New Features of Model 04-03: Refinements of Model 04-02 animation of queues length and points of queues changing entity pictures creating new one: copy, edit, and assign entity picture adding resource pictures creating resource picture from animation tool bar adding variable plots
13
13 Model 04.04
14
14 New Features of Model 04-04: Refinements of Model 04-03 saving connection links by station and route modules stations: module for program and icon for animation route: module for program and icon for animation changing an entity picture
15
15 Yield Management C = capacity of plane, 100 Q = # of reservations allowed X = actual # of passengers appear ~ Binomial (Q, 0.95) V = net profit = 1600X – 40000 – 180 min(X, C) - 2500 max(X-C, 0) result: Q * = 106