WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water
2
BASIS FOR RULES: – Same as for springs: n Plan review (Primacy) n Engineering principles n Experience
3
PLAN REVIEW PROCESS: – Prior to Drilling n Drilling Specifications – After Drilling n Chemical Analysis n Source Capacity n Source Protection n Equipping Specifications
4
WELL DRILLING SPECS: – Drilling Method – Surface Seal – Plumbness and Alignment – Construction Materials
5
WELL EQUIPPING: – Type of Pumps – Pitless Adaptors – Pump Capacity – Appurtenant Equipping – Well House Construction
6
Well System
7
WELL GROUTING:
8
SUBMERGED WELL:
9
PITLESS ADAPTOR:
11
CONVERTED SUBMERGED WELL:
12
WELL HOUSE PIPING:
14
WELL HOUSE CONSTRUCTION: – Heating – Ventilation – Drainage – Treatment
15
STORAGE CAPACITY ISSUES: – Average Day Use in gallons (gal) n Residence: 400gal n Picnic/Park: 5gal/person n Visitor’s Center: 5gal/person n Campground Hydrant: 35gal/person – ADD FIRE FLOW TO VOLUMES
16
DISTRIBUTION CAPACITY ISSUES: – Peak Instantaneous Use n Engineering Hydraulic Network Analysis n 20 psi minimum pressure under all conditions