DISSOLVED OXYGEN MONITOR TEAM MEMBERS: ANDREW BEOUGHER ANTHONY SWOPE HAO WANG I-CHUN CHAO BING BAI COLIN HICKS Senior Design Dec1211 Dec1211
2
DISSOLVED OXYGEN MONITOR Measures the concentration of dissolved oxygen (DO). Applications Waste water treatment Marine ecologies Fermentation Dec1211
3
DESIGN OBJECTIVES Re-engineer current design by removing or changing existing components. Lowering power consumption Adjusting system timing of the sensor Dec1211
4
DESIGN REQUIREMENTS Functional Microcontroller shall determine the dissolved oxygen level over 1 second Local and remote control operation Long battery life during discontinuous operation 5 samples every 5 minutes Operating duration of at least 30 days Dec1211
5
DESIGN REQUIREMENTS Non-functional Water resistant monitor unit enclosure Water proof sensor probe Local multi-character LCD Handheld / Portable Dec1211
6
SYSTEM CURRENT DESIGN Dec1211
7
SYSTEM PROPOSED DESIGN #1 Dual Supply System Dec1211
8
SYSTEM PROPOSED DESIGN #2 Single Supply System Dec1211
9
HARDWARE PROPOSED COMPONENTS Microcontroller ATXMega128 LED Current Driver MAXIM - MAX3699 TI - TPS61042 Linear Devices - LT1932 DC-DC Converters ADP - ADP150/151 TI - TPS61006 MAXIM - MAX1763 Dec1211
10
HARDWARE LED CURRENT DRIVERS Why drive with current and not voltage? Dec1211
11
HARDWARE BATTERY CONFIGURATIONS 3 potential configurations Dec1211
12
SOFTWARE CURRENT SENSOR TIMING Dec1211
13
SOFTWARE PROPOSED SENSOR TIMING Dec1211
14
TESTING COMPONENTS Power System: Power efficiency Current output LED driver: Startup times PWM output Actual vs. computed current output Microcontroller: Power consumption of different modes Dec1211
15
TESTING SYSTEM Full System Test: Long term battery duration Dec1211
16
TESTING SYSTEM Dec1211
17
PROJECT CURRENT STATUS Evaluate system operation Update customer requirements Perform component testing Create preliminary circuit board revisions Dec1211
18
PROJECT FUTURE PLANS Finalize new circuit board revisions Assemble new circuit board Perform long term battery duration tests Perform application and calibration testing Test programming modifications Re-integrate wireless communications Dec1211