1 Krzysztof Pennar Moshe Zilversmit Jon Winkler John Pignetti Ariane Mortazavi Takeshi Fuchiwaki Josh Fromm Structures Team Fall 2004 Final Report
2
2 Baseline Mission Current Work: Pin Pullers and Hinges Updated Solidworks files Preliminary FEA New bus configuration Individual Component Radiation Hardening Trade: –Showed increase in mass of 1.12 kg.
3
3 New Bus Configuration A preliminary FEA showed that a solid panel bus should be redesigned Designed a X-panel bus which weights 3.055kg Key design issue: Induced moment from being a piggyback satellite.
4
4 Upscope Mission Maintain mass savings with a new bus design vis-à-vis FEA A hexagonal bus design was chosen for more stability. It weights 5.487 kg.
5
5 Descope Mission With no propulsion tank bus size was reduced to a 30x30x15 cm box. Panels were kept solid due to radiation hardening trade. Bus mass is 5.85 kg.
6
6 Mass Savings and Updated Moments Previous Mass (kg) New Mass (kg) Savings (kg) Baseline7.8653.0553.69 Descope7.8655.852.015 Upscope7.8655.4861.212 Baseline Moments of Inertia (kg * m^2): Ix = 0.6915 Iy = 0.7981 Iz = 1.2180 Descope Moments of Inertia (kg * m^2): Ix = 0.644 Iy = 0.661 Iz = 0.160 Upscope Moments of Inertia (kg* m^2); Ix = 0.581 Iy = 0.734 Iz = 1.117