Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 10, 2001LArg Meeting1 Electronic Simulation Work at Victoria and TRIUMF Victoria: Erica Muzzerall, Dr. Richard Keeler TRIUMF: Dr. Chris Oram.

Similar presentations


Presentation on theme: "July 10, 2001LArg Meeting1 Electronic Simulation Work at Victoria and TRIUMF Victoria: Erica Muzzerall, Dr. Richard Keeler TRIUMF: Dr. Chris Oram."— Presentation transcript:

1 July 10, 2001LArg Meeting1 Electronic Simulation Work at Victoria and TRIUMF Victoria: Erica Muzzerall, Dr. Richard Keeler TRIUMF: Dr. Chris Oram

2 July 10, 2001LArg Meeting2 Outline Catch up on test beam simulation NIM paper, Leonid Examine non-ideal signal source Conclusion

3 July 10, 2001LArg Meeting3 Leonid’s HEC Chain

4 July 10, 2001LArg Meeting4 PSPICE Simulations Cadence PCB Series Software PSpice version 9.2 Can create schematics for analog or mixed signal designs, PCB layout PSpice can simulate analog designs PSpice libraries contain over 11,000 parts can download PSpice models directly from manufacturer’s web sites

5 July 10, 2001LArg Meeting5 HEC Electronics Chain

6 July 10, 2001LArg Meeting6 Calibration Chain

7 July 10, 2001LArg Meeting7 Cold Electronics

8 July 10, 2001LArg Meeting8 Warm Electronics

9 July 10, 2001LArg Meeting9 HEC Chain Output Left: fig 8 from HEC Note 109 Right: our PSpice output

10 July 10, 2001LArg Meeting10 Non Ideal Signal Source Fig 19, NIM paper

11 July 10, 2001LArg Meeting11 Hypothesis: Why these residuals? Consider 2 possible sources: Unequal Liquid Argon gaps in EST Uncertainty in the gap capacitances Future: Investigate cross talk

12 July 10, 2001LArg Meeting12 EST Drawing

13 July 10, 2001LArg Meeting13 Gap Tolerance

14 July 10, 2001LArg Meeting14 Model EST Drift Times: 400 V: 905 ns 1800 V: 548 ns

15 July 10, 2001LArg Meeting15 Ideal Shaper

16 July 10, 2001LArg Meeting16 Output from Perfect EST V = 400 VV = 1800 V

17 July 10, 2001LArg Meeting17 Modified Model EST ABBB AB 400 V1029 ns 864 ns 1800 V 624 ns 524 ns Drift Times:

18 July 10, 2001LArg Meeting18 Output from Modified Model EST V = 400 V red: ideal EST green: modified EST Gap change = 0.2 mm V = 1800 V

19 July 10, 2001LArg Meeting19 Procedure Gap change was adjusted to approximate peak height at end of NIM residual spectra 400 V : 0.055 mm 1800 V: 0.076 mm The capacitance of ideal circuit was altered to approximate distortions at the beginning of NIM residual spectra Ideal capacitance changed from 100 pf to 99 pf

20 July 10, 2001LArg Meeting20 Procedure T d takes into account E-field change

21 July 10, 2001LArg Meeting21 Results V = 400 VV = 1800 V

22 July 10, 2001LArg Meeting22 Results – realistic shaper

23 July 10, 2001LArg Meeting23 Conclusion The investigated effects are a plausible source of the observed residuals between the data and the nominal model. Future: Investigate cross talk


Download ppt "July 10, 2001LArg Meeting1 Electronic Simulation Work at Victoria and TRIUMF Victoria: Erica Muzzerall, Dr. Richard Keeler TRIUMF: Dr. Chris Oram."

Similar presentations


Ads by Google