Download presentation
Presentation is loading. Please wait.
Published byWilfrid Parrish Modified over 9 years ago
1
Page 1 Information Technology Update
2
Page 2 ERCOT Technology Architecture Today The current architecture is typical of an environment that started off as a “best-of- breed” solution but to meet rapidly changing user requirements became highly customized and disjointed due to the batch integration processes. Impacts of this type of evolution are: –Multiple systems of record for critical operational data Reduced ability to audit data and ensure data integrity Delayed availability of data needed for operational processing Need for substantial data-stores to “piece back together” history –High cost of ownership Significant upgrade costs (no longer an “out-of-the-box” solution) Need for specialist to maintain and support silos of technology –Risk of increased error rate Multiple touch points into applications “Broken” (not contiguous) process flows cause increase cost and potential errors –No integrated architectural foundation to spring-board functionality Focus on upgrade, support and performance takes priority over new features Shared services require tighter integration and consistent data
3
Page 3 Next Step for Architecture Evolution Leverage “Best-of-breed” technologies and existing upgrade / tuning budget to deliver a stronger foundation: –Drive vendors to “Productize” ERCOT requirements Leverage vendor packages into their strength Drive change from the vendor first Architect a more efficient cross-vendor integration solution –Implement enterprise data architecture Single data model for each Portfolio of applications Keep data at system of record Make data available at transaction level –Implement enterprise data workflow Granular transaction tracking End-to-end transaction handshake –Minimize “dead-money” Retire underutilized or over customized products
4
Page 4 PUC / Data Warehouse Effort PUCT Marketing Monitoring and Investigation Development of Computer Models and Quantitative Tools Ad-Hoc / Scheduled Reporting & Trending Data Requests Historic Market Modeling Market Design Analysis ERCOT Monitoring Systems – improve data infrastructure to support this function Planning – support the requirements for improved market modeling Data Warehouse – improve the overall data infrastructure, retrieval, dashboards, scorecards, information access and data retention ERCOT and PUCT efforts have multiple touch points and information overlap Multiple dependencies associated with these efforts which require careful and complete prioritization, communication, and coordination Leveraged resources and infrastructure reduces costs and risk to both parties
5
Page 5 Steering CommitteeChairman Klein (PUCT) Ken Shoquist (ERCOT) Ray Giuliani (ERCOT) Sam Jones (ERCOT) Core TeamPratish Kanani, Project Manager (ERCOT) Julie Gauldin, Business Requirements (PUCT) Tony Grasso, Engineer Economist (PUCT) Dr. David Hurlbut, Business Requirements (PUCT) Chris Uranga, Data Warehouse (ERCOT) Sreeni Yedavalli, Developer (ERCOT) Chandra Ramireddy, Developer (ERCOT) Dr. Jeyant Tamby, EMMS (ERCOT) Dr. Srini Sundhararajan, Developer (ERCOT) Troy Anderson, Bus Analyst (ERCOT) Marguerite Wagner, Market Operations (ERCOT) Dan Woodfin, Transmission Planning (ERCOT) Data Warehouse Project Advisory CommitteeParviz Adib (PUCT) Steve Wallace (ERCOT) Kevin Judice (ERCOT)
6
Page 6 Project Management Team – Rob Connell Staffing complete 3/03 Average Utility Experience9 Years Average Project Management Experience13 years Average IT Experience15 years An experienced team of 5 High degree of technical experience PMI certification (2) Advanced Degrees (2) Began formal weekly project reviews Strengthening project reporting tools
7
Page 7 Summary –Project Management is taking shape Project managers hired and in place Shaping of vendor relationships in line with plans has begun Reaction from internal team has been positive Project management disciplines have a major influence on the pace and culture of organization –Architecture plan is evolving EMMS product plan “straw man” is a great first step Commercial product plan being formed in conjunction with the business Continuous processes, touch points, transparency, cost, and access are key drivers –Top priorities Production Processes, Monitoring, Procedures Security Key Project Completions Refining/establishing product roadmaps Continue shaping IT Culture – customer interaction, project management, development methodologies, ERCOT IT ownership/accountability of projects, Setting the Bar
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.