Presentation is loading. Please wait.

Presentation is loading. Please wait.

Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.

Similar presentations


Presentation on theme: "Summary of instrument review National Research Coordinators Meeting Windsor, June 2008."— Presentation transcript:

1 Summary of instrument review National Research Coordinators Meeting Windsor, June 2008

2 NRC Meeting Windsor June 2008 Instrument revision The main survey instruments will be further revised based on: –Feedback from Project Advisory Committee –Feedback from NRCs at this meeting We welcome any further written feedback from countries but it needs to be sent within the next two weeks!

3 NRC Meeting Windsor June 2008 Cognitive test Generally, we will be able to keep most of the field trial items For a 45-minute test with seven booklets/clusters also some items with marginally satisfactory scaling properties will have to be deleted

4 NRC Meeting Windsor June 2008 Student questionnaire No fundamental format changes will be done and no new items should be added There was some interest in keeping some of the material proposed for deletion –Further revision will take country feedback into account –Some further items for single-item reporting may be retained The overall length of the questionnaire will have to be considered in the final revision

5 NRC Meeting Windsor June 2008 Teacher questionnaire Some further changes to be applied based on PAC and NRC feedback Attempt to make wording consistent between teacher and school questionnaire Teacher survey design –No change in target population definition (teaching in target grade) –15 teachers per school International option of oversampling CCE teachers

6 NRC Meeting Windsor June 2008 School questionnaire Some further changes to be applied based on PAC and NRC feedback Few comments received

7 NRC Meeting Windsor June 2008 Final instruments After NRC meeting further round of revisions Internal review of next version of instruments Final instruments with notes to be sent on 11 July 2008 Sample instruments (with final layout and assembly instructions) will be sent with manuals (Unit 2) on 28 July 2008

8 NRC Meeting Windsor June 2008 Questions or comments?


Download ppt "Summary of instrument review National Research Coordinators Meeting Windsor, June 2008."

Similar presentations


Ads by Google